Sadada (Total Energies) solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Total Siddadah

Sadada (Total Energies) solar farm is an operating solar photovoltaic (PV) farm in District of Al-Jufra, Libya.

Project Details

Table 1: Phase-level project details for Sadada (Total Energies) solar farm

Status Commissioning year Nameplate capacity Technology Owner Operator
Operating[1] 2023[1] 500 MW[2] PV[3] Total Energies SE; General Electricity Company of Libya (GECOL) (الشركة العامة للكهرباء)[2] Alpha Dhabi Holding (الشركة العامة للكهرباء)[4]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Sadada (Total Energies) solar farm

Location Coordinates (WGS 84)
District of Al-Jufra, Libya[2] 26.8234, 18.1237 (approximate)[2]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://www.agenzianova.com/en/news/libia-entrato-in-funzione-limpianto-solare-da-500-megawatt-a-ovest-di-sirte/. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 https://www.pv-tech.org/totalenergies-lands-500mw-libyan-solar-pv-project-alongside-us2bn-oil-and-gas-investments/. {{cite web}}: Missing or empty |title= (help)
  3. https://www.pv-magazine.com/2022/06/17/totalenergies-gecol-to-build-500-mw-of-solar-in-libya/. {{cite web}}: Missing or empty |title= (help)
  4. https://www.pv-magazine.com/2022/06/29/emirati-investor-reveals-plans-for-500-mw-of-solar-in-libya/. {{cite web}}: Missing or empty |title= (help)