Salman Oil and Gas Field (Brunei)

From Global Energy Monitor
This article is part of the Global Oil and Gas Extraction Tracker, a Global Energy Monitor project.
Report an error
Related categories:

Salman Oil and Gas Field is an operating oil and gas field in Brunei.

Salman Oil and Gas Field is a part of the Salman Project.

Project Details

Main Data

Table 1: Field-level project details for Salman Oil and Gas Field

1Final Investment Decision
Unit name Status Operator Owner Discovery year FID1 year Production start year Production type
Salman operating[1][2] Brunei Shell Petroleum Company[3][4] Government of Brunei [50%]; Shell PLC [50%][3][1][2][3][1][2] 2011[3] 2023[5][1][4] conventional[1][2]

Production and Reserves

Table 2: Reserves of Salman Oil and Gas Field

million bbl = million barrels of oil
Fuel description Reserves classification Quantity Units Data year Source
crude oil and condensate Remaining recoverable reserves 123.06 million bbl 2023 [1]

Table 3: Production from Salman Oil and Gas Field

million bbl/y = million barrels of oil per year
Category Fuel description Quantity Units Data year Source
production design capacity crude oil and condensate 13.14 million bbl/y 2024 [1]

Location

Table 4: Field-level location details for Salman Oil and Gas Field

Concession/Block Location Onshore/Offshore Coordinates (WGS 84)
BSP 1 & 2 Offshore Agreement Area[1] offshore, Brunei[6] offshore[7] 5.5175, 114.1913 (approximate)[6]

The map below shows the approximate location of the field(s) within the Salman Project ():

Loading map...

Articles and Resources

Additional Data

To access additional data, including an interactive map of oil and gas extraction sites, a downloadable dataset, and summary data, please visit the Global Oil and Gas Extraction Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 https://web.archive.org/web/20240731160912/https://www.offshore-technology.com/marketdata/oil-gas-field-profile-salman-conventional-oil-field-brunei/. Archived from the original on 31 July 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 https://web.archive.org/web/20210917211103/https://connect.ihsmarkit.com/upstream-insight/article/phoenix/1643198/bsp-to-tender-for-salman-fixed-platforms-soon. Archived from the original on 17 September 2021. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 https://web.archive.org/web/20200804114001/http://www.searchanddiscovery.com/abstracts/html/2012/90155ice/abstracts/al2.htm. Archived from the original on 04 August 2020. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  4. 4.0 4.1 https://web.archive.org/web/20210917205702/https://connect.ihsmarkit.com/upstream-insight/article/phoenix/1518416/main-bidders-for-bsps-salman-project-identified. Archived from the original on 17 September 2021. {{cite web}}: Missing or empty |title= (help)
  5. https://web.archive.org/web/20250118004131/https://mediapermata.com.bn/jpm-tingkat-prospek-pengeluaran-sektor-huluan/. Archived from the original on 18 January 2025. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 https://rimbawatchmy.com/databases. {{cite web}}: Missing or empty |title= (help)
  7. https://www.naturalearthdata.com/downloads/10m-physical-vectors/10m-land/. {{cite web}}: Missing or empty |title= (help)