Samara power station
| Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
| Related categories: |
Samara power station (Самарская ТЭЦ) is an operating power station of at least 330-megawatts (MW) in Samara, Russia with multiple units, some of which are not currently operating.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Samara power station | Samara, Samara, Russia | 53.2514, 50.2756 (exact)[1][2] |
Unit-level coordinates (WGS 84):
- 1, 2, 3, 4, 5, 8: 53.2514, 50.2756
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Retired year | Emergency/Backup |
|---|---|---|---|---|---|---|---|---|
| 1 | Operating[3] | fossil gas: natural gas, fossil liquids: heavy fuel oil[4] | 60[5] | steam turbine[6][2] | yes[3] | 1975[6] | – | no |
| 2 | Operating[3] | fossil gas: natural gas, fossil liquids: heavy fuel oil[4] | 110[5] | steam turbine[6][2] | yes[3] | 1978[6] | – | no |
| 3 | Operating[3] | fossil gas: natural gas, fossil liquids: heavy fuel oil[4] | 110[5] | steam turbine[6][2] | yes[3] | 1978[6] | – | no |
| 4 | Retired[3][7][8] | fossil gas: natural gas, fossil liquids: heavy fuel oil[4] | 110[5] | steam turbine[6][2] | yes[3] | 1978[9][6] | 2024[7][10] | no |
| 5 | Operating[3] | fossil gas: natural gas, fossil liquids: heavy fuel oil[4] | 50[5] | steam turbine[6][2] | yes[3] | 2002[6] | – | no |
| 8 | Pre-construction[11][9][12][13][14][15][16][17][18][19][20][21][22] | fossil gas: natural gas, fossil liquids: heavy fuel oil[4] | 125[18][15][23][13] | steam turbine[18][15][23] | yes[3] | 2029 (planned)[9][12][23][13][15][16][24][18][25][7] | – | no |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| 1 | T Plus PJSC [100%][3] | T Plus PJSC [100.0%] |
| 2 | T Plus PJSC [100%][3] | T Plus PJSC [100.0%] |
| 3 | T Plus PJSC [100%][3] | T Plus PJSC [100.0%] |
| 4 | T Plus PJSC [100%][3] | T Plus PJSC [100.0%] |
| 5 | T Plus PJSC [100%][3] | T Plus PJSC [100.0%] |
| 8 | T Plus PJSC [100%][3] | T Plus PJSC [100.0%] |
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
CHP is a division of PJSC T Plus. Provides heat and electricity to a third of the residential sector of the regional center and more than five large industrial enterprises in Samara.[26]
Unit 4 is to retire by 2025 and be replaced by 125 MW unit (4R).[27]
In August 2023, it was reported that T Plus had issued the first tranche of financing for the modernization of Unit 4. The total cost of the project is RUR 10.6 billion. The modernization of the plant aims to increase both electrical and heat capacity, enhancing the efficiency of heat and electricity production. The steam turbine, generator, transformer, and auxiliary equipment will undergo comprehensive upgrades. The commissioning of the new unit is scheduled for 2025.[28][29]
A tender for dismantling of Unit 4 was announced by T Plus in December 2023 with the closing date in February 2024.[30] Another tender for replacement of Unit 4 was announced by T Plus in April 2024 with the closing date in May 2024.[31]
In June 2024, it was reported that the Ural Turbine Works had successfully tested a new steam turbine manufactured for the Samara power station. The replacement equipment for the stator has already arrived at the site. The dismantling of the old unit's equipment at the plant was nearing completion.[32] According to the Draft Scheme and Program for the Development of Electric Power System of Russia for 2025–2030, released by the Russian Ministry of Energy in October 2024, Unit 4 was retired in April 2024, and Unit 4R is still expected to be commissioned in 2025.[33]
In February 2025, it was reported that software had been developed for the automated control system of Unit 4R. The testing of the control system is scheduled for June 2025.[34]
In February 2025, it was reported that the modernization project at the Samara power station had been removed from the list of modernization projects by the Government of Russia.[35][36] According to the source, the government removed T Plus from its modernization obligations. The directive excludes the company without specifying particular projects, but based on the documents from which T Plus was removed, this likely refers to the modernization of Izhevsk CHP-2 and Samara power station.[37] It is unclear which modernization project at the Samara power station the sources are referring to.
In August 2025, the control system testing for the steam turbine of Unit 4R was completed at Ural Turbine Works.[38] In September 2025, the CEO of T Plus mentioned in an interview that the company was ready to go back to its modernization project at the Samara power station since the steam turbine, the generator, and almost all auxiliary equipment had already been contracted and produced.[39]
In February 2026, it was reported that the Samara power station was selected under the competitive capacity selection and modernization program (KOMmod), with T Plus planning to complete the upgrade in 2029 as part of a package with Izhevsk CHP-2 worth just over RUB 20 billion. As a result of the modernization, Unit 7 (100 MW) at the Togliatti power station will be replaced by Unit 8 (125 MW) at the Samara power station in July 2029. The new unit will be built on the site of the retired Unit 4.[40][41][42]
Articles and Resources
References
- ↑ https://www.google.com/maps/place/Samarskaya+Tets/@53.251479,50.2743133,628m/data=!3m1!1e3!4m5!3m4!1s0x4166199b1b38d431:0x9463928e035a7de2!8m2!3d53.2514522!4d50.2725608.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 https://energybase.ru/power-plant/Samara_CHP.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 3.12 3.13 3.14 3.15 3.16 https://web.archive.org/web/20220726093802/https://www.tplusgroup.ru:443/org/samara/organization/samarskaja-tehc/. Archived from the original on 2022-07-26.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 4.2 4.3 4.4 4.5 https://web.archive.org/web/20210830222437/https://www.so-ups.ru/index.php?id=1430. Archived from the original on 2021-08-30.
{{cite web}}: Missing or empty|title=(help) - ↑ 5.0 5.1 5.2 5.3 5.4 https://web.archive.org/web/20210615144832/http://globalenergyobservatory.org/form.php?pid=42040. Archived from the original on 2021-06-15.
{{cite web}}: Missing or empty|title=(help) - ↑ 6.00 6.01 6.02 6.03 6.04 6.05 6.06 6.07 6.08 6.09 https://web.archive.org/web/20210830233704/https://ru.wikipedia.org/wiki/%D0%A1%D0%B0%D0%BC%D0%B0%D1%80%D1%81%D0%BA%D0%B0%D1%8F_%D0%A2%D0%AD%D0%A6. Archived from the original on 2021-08-30.
{{cite web}}: Missing or empty|title=(help) - ↑ 7.0 7.1 7.2 (PDF) https://www.so-ups.ru/fileadmin/files/company/future_plan/public_discussion/project/2024/project_sipr_2025-30_p_2.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ "Тендер: выполнение демонтажных работ по объекту Модернизация Самарской ТЭЦ с заменой ТА ст.№4". www.komtender.ru. Archived from the original on 2024-05-08. Retrieved 2024-05-07.
{{cite web}}: Text "Все коммерческие тендеры России" ignored (help); Text "Самара" ignored (help) - ↑ 9.0 9.1 9.2 https://web.archive.org/web/20230806070504/https://xn--90ab5f.xn--p1ai/press-tsentr/56201/. Archived from the original on 2023-08-06.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20220528110218/https://www.niasam.ru/zhkh/t-plyus-nachala-podgotovku-k-modernizatsii-samarskoj-tets-po-dpm-2-188076.html. Archived from the original on 2022-05-28.
{{cite web}}: Missing or empty|title=(help) - ↑ https://dbe-samara.ru/file/2021/12/%D0%90%D0%BA%D1%82%D1%83%D0%B0%D0%BB%D0%B8%D0%B7%D0%B8%D1%80%D0%BE%D0%B2%D0%B0%D0%BD%D0%BD%D0%B0%D1%8F-%D1%81%D1%85%D0%B5%D0%BC%D0%B0-%D1%82%D0%B5%D0%BF%D0%BB%D0%BE%D1%81%D0%BD%D0%B0%D0%B1%D0%B6%D0%B5%D0%BD%D0%B8%D1%8F-%D0%BD%D0%B0-2022-%D0%B3%D0%BE%D0%B4.pdfб.
{{cite web}}: Missing or empty|title=(help) - ↑ 12.0 12.1 https://energyland.info/news-show-tek-alternate-280861.
{{cite web}}: Missing or empty|title=(help) - ↑ 13.0 13.1 13.2 https://tass.ru/ekonomika/26431103.
{{cite web}}: Missing or empty|title=(help) - ↑ "ГЕНЕРАЛЬНАЯ СХЕМА размещения объектов электроэнергетики до 2042 года" (PDF). SO UPS of Russia. 2024-12-30. Archived from the original (PDF) on 2025-07-13. Retrieved 2025-03-10.
- ↑ 15.0 15.1 15.2 15.3 http://publication.pravo.gov.ru/document/0001202601310004?index=14.
{{cite web}}: Missing or empty|title=(help) - ↑ 16.0 16.1 (PDF) https://web.archive.org/web/20230313040749/https://www.so-ups.ru/fileadmin/files/company/future_plan/public_discussion/2023/final/60_Samarskaja_oblast_fin.pdf. Archived from the original (PDF) on 2023-03-13.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.ec-ute.ru/news/2025/08/01/.
{{cite web}}: Missing or empty|title=(help) - ↑ 18.0 18.1 18.2 18.3 https://web.archive.org/web/20221130155326/https://www.garant.ru/products/ipo/prime/doc/404487690/. Archived from the original on 2022-11-30.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.ec-ute.ru/news/.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.interfax.ru/russia/1008925.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.in-power.ru/news/novostitek/55403-novaja-turbina-dlja-samarskoi-tec-uspeshno-proshla-ispytanija-na-zavode-izgotovitel.html.
{{cite web}}: Missing or empty|title=(help) - ↑ "генеральный подряд по объекту «Модернизация Самарской ТЭЦ с заменой ТА ст.№4» для нужд ПАО «Т Плюс» — Тендер № 3633749 — Московская область — ПАО «Т Плюс» — B2B-Center". www.b2b-center.ru. Archived from the original on 2024-05-08. Retrieved 2024-05-07.
- ↑ 23.0 23.1 23.2 (PDF) https://dbe-samara.ru/file/2021/12/%D0%90%D0%BA%D1%82%D1%83%D0%B0%D0%BB%D0%B8%D0%B7%D0%B8%D1%80%D0%BE%D0%B2%D0%B0%D0%BD%D0%BD%D0%B0%D1%8F-%D1%81%D1%85%D0%B5%D0%BC%D0%B0-%D1%82%D0%B5%D0%BF%D0%BB%D0%BE%D1%81%D0%BD%D0%B0%D0%B1%D0%B6%D0%B5%D0%BD%D0%B8%D1%8F-%D0%BD%D0%B0-2022-%D0%B3%D0%BE%D0%B4.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) https://web.archive.org/web/20240120035218/https://www.bigpowernews.ru/photos/0/0_hwMWLFCE8gF4WY3kGoos5DkyfTCuFMXM.pdf. Archived from the original (PDF) on 2024-01-20.
{{cite web}}: Missing or empty|title=(help) - ↑ Russian Power System Operator. "СХЕМА И ПРОГРАММА РАЗВИТИЯ ЭЛЕКТРОЭНЕРГЕТИЧЕСКИХ СИСТЕМ РОССИИ НА 2024–2029 ГОДЫ: ЭНЕРГОСИСТЕМА САМАРСКОЙ ОБЛАСТИ" (PDF). Archived from the original (PDF) on 2024-03-13.
- ↑ "Самарская ТЭЦ | АО «Системный оператор Единой энергетической системы»". www.so-ups.ru (in русский). Retrieved 2022-11-08.
- ↑ "Приказ Министерства энергетики РФ от 28 февраля 2022 г. № 146 "Об утверждении схемы и программы развития Единой энергетической системы России на 2022 - 2028 годы"".
{{cite web}}: CS1 maint: url-status (link) - ↑ "ВЭБ.РФ открыл финансирование модернизации Самарской ТЭЦ". вэб.рф. August 1, 2023. Retrieved December 1, 2023.
{{cite web}}: CS1 maint: url-status (link) - ↑ "СХЕМА И ПРОГРАММА РАЗВИТИЯ ЭЛЕКТРОЭНЕРГЕТИЧЕСКИХ СИСТЕМ РОССИИ НА 2024–2029 ГОДЫ. ЭНЕРГОСИСТЕМА САМАРСКОЙ ОБЛАСТИ" (PDF). So UPS of Russia. November 30, 2023. Retrieved May 7, 2024.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Тендер: выполнение демонтажных работ по объекту "Модернизация Самарской ТЭЦ с заменой ТА ст. №4"". комтендер. December 7, 2024. Retrieved May 7, 2024.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Конкурентные переговоры № 3633749". Центр электронных торгов. April 12, 2024. Retrieved May 7, 2024.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Новая турбина для Самарской ТЭЦ успешно прошла испытания на заводе-изготовителе". www.in-power.ru. June 13, 2024. Retrieved December 3, 2024.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Доработанные обосновывающие материалы". СО ЕЭС России. Ocotber 31, 2024. Retrieved December 2, 2024.
{{cite web}}: Check date values in:|date=(help)CS1 maint: url-status (link) - ↑ "Разработка и внедрение системы автоматизированного управления (САУ и ЭЧСРиЗ) паровой турбиной Тп-124-12,8-NG ст.№ 4 Самарской ТЭЦ ПАО «Т Плюс»". www.ec-ute.ru. February 18, 2025. Retrieved March 12, 2025.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Власти обсудят отказ от модернизации 15 электростанций". www.rbc.ru. December 24, 2024. Retrieved March 20, 2025.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Правительство заморозило 15 проектов модернизации ТЭЦ". www.c-o-k.ru/market_news. February 18, 2025. Retrieved March 20, 2025.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Правительство согласовало отказ генкомпаний от проектов модернизации в электроэнергетик". Interfax. February 14, 2025. Retrieved March 20, 2025.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Завершен основной этап заводских испытаний системы управления для паровой турбины, изготовленной АО «УТЗ» для Самарской ТЭЦ ПАО «Т Плюс»". www.ec-ute.ru. August 1, 2025. Retrieved October 17, 2025.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Глава "Т Плюс": сроки плановых отключений горячей воды в РФ будут сокращаться". TASS. September 3, 2025. Retrieved October 17, 2025.
{{cite web}}: CS1 maint: url-status (link) - ↑ ""Т плюс" вложит в модернизацию Самарской и Ижевской ТЭЦ более 20 млрд рублей". 2026-02-12. TASS. Retrieved 2026-03-27.
{{cite web}}: Check date values in:|date=(help)CS1 maint: url-status (link) - ↑ EnergyLand (2026-03-23). "«Т Плюс» предлагает продлить меры поддержки когенерации". energyland.info. Retrieved 2026-03-27.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Распоряжение Правительства Российской Федерации от 31.01.2026 № 148-р". /publication.pravo.gov.ru. 2026-01-31. Retrieved 2026-03-26.
{{cite web}}: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.