San Cebrián wind farm
From Global Energy Monitor
| This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
San Cebrián wind farm (Parque eólico San Cebrián) is a wind farm under construction in Valbuena de Pisuerga, Palencia, Castilla y León, Spain.
Project Details
Table 1: Phase-level project details for San Cebrián wind farm
| Status | Nameplate capacity | Type | Owner |
|---|---|---|---|
| Construction[1] | 46.5 MW[2] | Onshore[3] | Estudios y Proyectos Pradamap SL [100%][3] |
Location
Table 2: Phase-level location details for San Cebrián wind farm
| Location | Coordinates (WGS 84) |
|---|---|
| Valbuena de Pisuerga, Palencia, Castilla y León, Spain[3] | 42.1755, -4.2054 (approximate)[3] |
The map below shows the approximate location of the wind farm:
Related Projects
This project is related to the following project:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ https://govclipping.com/es/castillayleon/boa/2023-12-13/7569-resolucion-28-noviembre-2023-direccion-general-energia-minas-se-concede-reconocimiento-concreto-utilidad-publica-instalacion-produccion-energia-electrica-origen-eolico-denominada-san-cebrian-linea-alta-tension-subterranea-evacuacion-ubicar-terminos-municipales-valbuena-pisuerga-palencia-castrojeriz-vallejera-balbases-villaquiran-puebla-burgos, https://bocyl.jcyl.es/boletines/2022/08/11/pdf/BOCYL-D-11082022-23.pdf, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-23034 https://www.laso.pt/es/laso-conclui-operacao-de-transporte-para-o-novo-parque-eolico-de-san-cebrian-em-espanha/, https://govclipping.com/es/castillayleon/boa/2023-12-13/7569-resolucion-28-noviembre-2023-direccion-general-energia-minas-se-concede-reconocimiento-concreto-utilidad-publica-instalacion-produccion-energia-electrica-origen-eolico-denominada-san-cebrian-linea-alta-tension-subterranea-evacuacion-ubicar-terminos-municipales-valbuena-pisuerga-palencia-castrojeriz-vallejera-balbases-villaquiran-puebla-burgos, https://bocyl.jcyl.es/boletines/2022/08/11/pdf/BOCYL-D-11082022-23.pdf, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-23034.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help) - ↑ https://bocyl.jcyl.es/boletines/2022/08/11/pdf/BOCYL-D-11082022-23.pdf, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-23034 https://govclipping.com/es/castillayleon/boa/2023-12-13/7569-resolucion-28-noviembre-2023-direccion-general-energia-minas-se-concede-reconocimiento-concreto-utilidad-publica-instalacion-produccion-energia-electrica-origen-eolico-denominada-san-cebrian-linea-alta-tension-subterranea-evacuacion-ubicar-terminos-municipales-valbuena-pisuerga-palencia-castrojeriz-vallejera-balbases-villaquiran-puebla-burgos, https://bocyl.jcyl.es/boletines/2022/08/11/pdf/BOCYL-D-11082022-23.pdf, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-23034.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help) - ↑ 3.0 3.1 3.2 3.3 "RESOLUCIÓN de 28 de noviembre de 2023, de la Dirección General de Energía y Minas, por la que se concede reconocimiento, en concreto, de utilidad pública a la instalación de producción de energía eléctrica de origen eólico denominada «San Cebrián»". Gov Clipping. 2023-12-13. Archived from the original on 2024-03-29. Retrieved 2024-03-01.
