San Marcelino Solar Power Project

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: San Marcelino Solar Power Project (Phase 3)

San Marcelino Solar Power Project is an announced solar photovoltaic (PV) farm in San Marcelino, Zambales Province, Philippines.

Project Details

Table 1: Phase-level project details for San Marcelino Solar Power Project

Phase name Status Commissioning year Nameplate capacity Technology
1 Construction[1] 2023 (planned)[1] 224 MW[1] PV[1]
2 Construction[1] 2023 (planned)[1] 80 MW[1] PV[1]
3 Announced[2] 2024 (planned)[2] 96 MW[2] PV[2]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for San Marcelino Solar Power Project

Phase Name Location Coordinates (WGS 84)
1 San Marcelino, Zambales Province, Philippines[3] 15.0279, 120.2781 (approximate)[4]
2 San Marcelino, Zambales Province, Philippines[1] 15.0279, 120.2781 (approximate)[1]
3 San Marcelino, Zambales Province, Philippines[2] 15.0519, 120.2659 (approximate)[2]

The map below shows the approximate locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 (PDF) https://www.doe.gov.ph/sites/default/files/pdf/electric_power/01_Luzon%20Committed.pdf. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 (PDF) https://www.doe.gov.ph/sites/default/files/pdf/electric_power/06_Luzon%20Indicative.pdf. {{cite web}}: Missing or empty |title= (help)
  3. (PDF) https://www.acenrenewables.com/wp-content/uploads/2022/01/SEC-17C-Subscription-by-the-Company-to-shares-in-Santa-Cruz-Solar-Energy-Inc..pdf. {{cite web}}: Missing or empty |title= (help)
  4. (PDF) https://www.doe.gov.ph/sites/default/files/pdf/electric_power/luzon_indicative_2022-mar-31-updated-05172022.pdf?withshield=1. {{cite web}}: Missing or empty |title= (help)