San Pedro de Atacama (CESPA) solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
San Pedro de Atacama (CESPA) solar farm (Parque Solar San Pedro de Atacama (CESPA)) is an operating solar photovoltaic (PV) farm in Provincia de El Loa, Antofagasta Region, Chile.
Project Details
Table 1: Phase-level project details for San Pedro de Atacama (CESPA) solar farm
Status | Commissioning year | Nameplate capacity | Technology | Operator |
---|---|---|---|---|
Operating[1] | 2022[1] | 2 MW[1] | PV[1] | Cooperativa Eléctrica de San Pedro de Atacama (CESPA)[1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for San Pedro de Atacama (CESPA) solar farm
Location | Coordinates (WGS 84) |
---|---|
Provincia de El Loa, Antofagasta Region, Chile[1] | -22.9082, -68.1978 (approximate)[1] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References