Santa Cruz power station (Brazil) (Usina Termelétrica Santa Cruz) is an operating power station of at least 500-megawatts (MW) in Santa Cruz, Rio de Janeiro, Brazil.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Santa Cruz power station (Brazil) Santa Cruz, Rio de Janeiro, Brazil -22.914269, -43.765292 (exact)[1]
Loading map...

Unit-level coordinates (WGS 84):

  • 1: -22.914269, -43.765292

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Emergency/Backup
1 Operating[2][3] fossil gas: natural gas[1][3][4][5][6] 500[2][3][7] combined cycle[8][9][10] not found 2023[4][5][9][10] no

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Operator Owner Parent
1 Âmbar Energia[7] Âmbar Energia SA [100%][11][12][7] J&F Investimentos SA [100.0%]

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

The Santa Cruz power plant currently has two gas-fired units, installed in 2004 and 2010, respectively; each unit has 175 MW of generating capacity.[13][14] Plans call for the plant to convert to a combined cycle system with the addition of a 150-megawatt steam turbine.[14][15] According to the website of plant owner Eletrobras Furnas, the combined cycle addition was scheduled for completion in April 2021.[13] As of May 2022, work on the new steam turbine was said to be 98% complete.[16] However, as of November 2022, Brazil's government database still listed a capacity of 350 MW for the Santa Cruz power plant, implying that the plant had not yet begun operating in combined cycle mode.[17]

Articles and Resources

References

  1. ↑ 1.0 1.1 "SIGA - Sistema de Informações de Geração da ANEEL". Agência Nacional de Energia Elétrica (ANEEL). 2023. Archived from the original on 2024-01-25. Retrieved 2023-10-10.
  2. ↑ 2.0 2.1 https://app.powerbi.com/view?r=eyJrIjoiNGE3NjVmYjAtNDFkZC00MDY4LTliNTItMTVkZTU4NWYzYzFmIiwidCI6IjQwZDZmOWI4LWVjYTctNDZhMi05MmQ0LWVhNGU5YzAxNzBlMSIsImMiOjR9. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.0 3.1 3.2 https://www.ccee.org.br/documents/80415/31088149/resultado_vendedor_4LRCAP.pdf/81fc4d77-2d85-6628-48b2-19560c937920. {{cite web}}: Missing or empty |title= (help)
  4. ↑ 4.0 4.1 (PDF) https://web.archive.org/web/20240125090909/https://www.camara.leg.br/internet/comissao/index/mista/orca/orcamento/OR2020/Fiscobras2019/anexo/SINTETICOS/Sint%C3%A9tico_2019_65.pdf. Archived from the original (PDF) on 2024-01-25. {{cite web}}: Missing or empty |title= (help)
  5. ↑ 5.0 5.1 https://web.archive.org/web/20240125090921/https://www.furnas.com.br/subsecao/138. Archived from the original on 2024-01-25. {{cite web}}: Missing or empty |title= (help)
  6. ↑ (PDF) https://web.archive.org/web/20240124233259/https://energiaeambiente.org.br/wp-content/uploads/2022/12/termeletricas_IEMA_2021.pdf. Archived from the original (PDF) on 2024-01-24. {{cite web}}: Missing or empty |title= (help)
  7. ↑ 7.0 7.1 7.2 https://jfinvest.com.br/ambar-energia-conclui-aquisicao-de-12-usinas-da-eletrobras-no-estado-do-amazonas/. {{cite web}}: Missing or empty |title= (help)
  8. ↑ https://web.archive.org/web/20240125101206/https://www.oec-eng.com/pt-br/noticias/ute-santa-cruz-gera-energia-pela-primeira-vez. Archived from the original on 2024-01-25. {{cite web}}: Missing or empty |title= (help)
  9. ↑ 9.0 9.1 https://web.archive.org/web/20240125101126/https://clickpetroleoegas.com.br/usina-termeletrica-no-rj-testes-sao-concluidos-pela-oec-e-tenenge-na-ute-santa-cruz-agora-o-empreendimento-esta-pronto-para-contribuir-com-o-sistema-interligado-nacional/. Archived from the original on 2024-01-25. {{cite web}}: Missing or empty |title= (help)
  10. ↑ 10.0 10.1 https://web.archive.org/web/20240125101118/https://novonor.com/pt/noticias/oec-e-tenenge-concluem-testes-e-ute-santa-cruz-esta-pronta-para-fornecer-energia-ao-sistema-interligado-nacional. Archived from the original on 2024-01-25. {{cite web}}: Missing or empty |title= (help)
  11. ↑ https://ambarenergia.com.br/en/ambar-energia-closes-agreement-with-edf-to-acquire-ute-norte-fluminense/. {{cite web}}: Missing or empty |title= (help)
  12. ↑ "Eletrobras vende suas 13 termelétricas para Âmbar Energia por R$ 4,7 bilhões". O Globo. 2024-06-10. Archived from the original on 2026-04-23. Retrieved 2024-09-29.
  13. ↑ 13.0 13.1 "Usina de Santa Cruz - 350 MW". FURNAS. Archived from the original on May 3, 2021. Retrieved May 4, 2021.
  14. ↑ 14.0 14.1 "www.camara.leg.br/internet/comissao/index/mista/orca/orcamento/OR2020/Fiscobras2019/anexo/SINTETICOS/Sint%C3%A9tico_2019_65.pdf" (PDF). Archived (PDF) from the original on November 12, 2021. Retrieved January 20, 2022.
  15. ↑ "Termelétrica Santa Cruz chega modernizada aos 51 anos". Eletrobras Furnas. May 13, 2019.{{cite web}}: CS1 maint: url-status (link)
  16. ↑ https://web.archive.org/web/20221126180522/https://www.oec-eng.com/pt-br/noticias/consorcio-santa-cruz-recebe-visita-tecnica. {{cite web}}: |archive-url= requires |archive-date= (help); Missing or empty |title= (help)
  17. ↑ "SIGA - ANEEL". SeTIC-UFSC. Retrieved 2022-04-01.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.