Sara-Clarencia Gas Pipeline
From Global Energy Monitor
Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Related categories: |
Sara-Clarencia Gas Pipeline is a proposed gas pipeline in Chile.[1][2]
Location
The pipeline is proposed to run from the Sara compressor station to the Clarencia measuring station in Tierra de Fuego, Chile.[3]
Project details
Main Line
- Operator:
- Owner: ENAP Magallanes[3]
- Parent company:
- Capacity: 150.000 - 450.000 standard cubic meters per day[4]
- Start year: 2027[1]
- Cost: US$15.5 million[1]
- Financing:
- Associated infrastructure:
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 "Gasoducto Sara-Clarencia entrará en operaciones en 2027". La Prensa Austral (in español). 2025-06-28. Retrieved 2025-09-01.
- ↑ SERVICIO DE EVALUACIÓN AMBIENTAL (2025). "Ficha del Proyecto: Proyecto de Construcción Gasoducto Sara-Clarencia". seia.sea.gob.cl.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 3.0 3.1 "Documento - 2024/04/24/76df-30cb-4244-8065-bcd4cbe8b532". infofirma.sea.gob.cl. Retrieved 2025-09-01.
- ↑ 4.0 4.1 4.2 4.3 "DECLARACIÓN DE IMPACTO AMBIENTAL PROYECTO DE CONSTRUCCIÓN "GASODUCTO SARA-CLARENCIA" CAPÍTULO 1 DESCRIPCIÓN DEL PROYECTO" (PDF).
{{cite web}}
: line feed character in|title=
at position 85 (help)CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas pipelines, a downloadable dataset, and summary data, please visit the Global Gas Infrastructure Tracker on the Global Energy Monitor website.