Sayedpur power station
| Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
| Related categories: |
Sayedpur power station is a power station under construction in Sayedpur, Rangpur, Bangladesh. It is also known as Saidpur power plant.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Sayedpur power station | Sayedpur, Rangpur, Bangladesh | 25.782652, 88.897118 (approximate)[1] |
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Equipment | Emergency/Backup |
|---|---|---|---|---|---|---|---|---|
| 2 | Construction[2][3][4][1][5] | fossil liquids: heavy fuel oil[1] | 150[1] | gas turbine[6] | not found | 2026 (planned)[3] | Siemens Energy: SGT5-2000E[7] | no |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| 2 | Bangladesh Power Development Board [100%][1] | Bangladesh Power Development Board [100.0%] |
Financing Details
The project has an estimated cost of US$103.2 million and is believed to have recieved equity in the amount of US$31.09 million from the Bangladesh Power Development Board and US$25.5 million from the government of Bangladesh. It is also believed to have received a loan of US$46.6 million from Bank of China.[8]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 (PDF) https://web.archive.org/web/20220626173458/https://bdcom.bpdb.gov.bd/bpdb_new/resourcefile/annualreports/annualreport_1640756525_Annual_Report_2020-2021_latest.pdf. Archived from the original (PDF) on 2022-06-26.
{{cite web}}: Missing or empty|title=(help) - ↑ https://businesspostbd.com/back/2023-05-24/govt-plans-to-resume-construction-of-high-cost-nilphamari-power-plant-2023.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 (PDF) https://cpd.org.bd/resources/2025/06/Presentation-The-Power-and-Energy-Sector-in-the-National-Budget-FY2025-26.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ https://drive.google.com/file/d/1HIDtQmLmHL3EziZF8Rmezv3neEsLOUDn/view.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) https://web.archive.org/web/20240528181819/https://bpdb.portal.gov.bd/sites/default/files/files/bpdb.portal.gov.bd/page/771c9a89_a06c_4c2f_9b8c_699d17ed769a/2023-12-20-09-13-bc35a2ac1abda167c7c48437e4dc1061.pdf. Archived from the original (PDF) on 2024-05-28.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20221130182505/https://press.siemens.com/global/en/pressrelease/securing-future-power-supply-northern-bangladesh. Archived from the original on 2022-11-30.
{{cite web}}: Missing or empty|title=(help) - ↑ "Siemens Wins Contract For 150 MW Plant". Power Progress. 2020-09-18. Archived from the original on 2024-06-28. Retrieved 2024-06-24.
- ↑ "Govt plans to resume construction of high-cost Nilphamari power plant". Retrieved 2025-09-16.