Scarlet II Hybrid solar farm
From Global Energy Monitor
| This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Scarlet II Hybrid solar farm is an operating solar photovoltaic (PV) farm in Fresno County, California, United States.
Project Details
Table 1: Phase-level project details for Scarlet II Hybrid solar farm
| Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner |
|---|---|---|---|---|---|
| GEN03 | Operating[1] | 2024[1] | 200 MWac[2] | PV[2] | EDP Renewables[1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Scarlet II Hybrid solar farm
| Phase Name | Location | Coordinates (WGS 84) |
|---|---|---|
| GEN03 | Fresno County, California, United States[2] | 36.6037, -120.3757 (exact)[2] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 https://www.renewableenergymagazine.com/pv_solar/edp-renewables-na-unveils-200-mw-solar-20250508 https://www.eia.gov/electricity/data/eia860m/, https://www.renewableenergymagazine.com/pv_solar/edp-renewables-na-unveils-200-mw-solar-20250508.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
