Scarlet II Hybrid solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Scarlet II Hybrid solar farm is an operating solar photovoltaic (PV) farm in Fresno County, California, United States.

Project Details

Table 1: Phase-level project details for Scarlet II Hybrid solar farm

Phase name Status Commissioning year Nameplate capacity Technology Owner
GEN03 Operating[1] 2024[1] 200 MWac[2] PV[2] EDP Renewables[1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Scarlet II Hybrid solar farm

Phase Name Location Coordinates (WGS 84)
GEN03 Fresno County, California, United States[2] 36.6037, -120.3757 (exact)[2]

The map below shows the exact location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. ↑ 1.0 1.1 1.2 https://www.renewableenergymagazine.com/pv_solar/edp-renewables-na-unveils-200-mw-solar-20250508 https://www.eia.gov/electricity/data/eia860m/, https://www.renewableenergymagazine.com/pv_solar/edp-renewables-na-unveils-200-mw-solar-20250508. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  2. ↑ 2.0 2.1 2.2 2.3 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.