Schornhof Solar
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Schornhof Solar is an operating solar photovoltaic (PV) farm in Landkreis Neuburg-Schrobenhausen, Bavaria, Germany.
Project Details
Table 1: Phase-level project details for Schornhof Solar
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
1900-01-01 00:00:00 | Operating[1] | 2020[1] | 20.4 MWp/dc[1] | PV[1] | Anumar[2][3] | Anumar[1] |
1900-01-02 00:00:00 | Operating[1] | 2021[1] | 21.8 MWp/dc[1] | PV[1] | Anumar[2][3] | Anumar[1] |
1900-01-03 00:00:00 | Operating[1] | 2021[1] | 20.9 MWp/dc[1] | PV[1] | Anumar[2][3] | Anumar[1] |
1900-01-04 00:00:00 | Operating[3] | 2021[3] | 57 MWp/dc[2] | PV[1] | Anumar[2][3] | Anumar[2] |
1900-01-05 00:00:00 | Announced[4] | – | 60 MWp/dc[4] | PV[4] | Anumar[4] | – |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Schornhof Solar
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1900-01-01 00:00:00 | Landkreis Neuburg-Schrobenhausen, Bavaria, Germany[1] | 48.6530, 11.2762 (exact)[1] |
1900-01-02 00:00:00 | Landkreis Neuburg-Schrobenhausen, Bavaria, Germany[1] | 48.6387, 11.2790 (exact)[1] |
1900-01-03 00:00:00 | Landkreis Neuburg-Schrobenhausen, Bavaria, Germany[1] | 48.6563, 11.2822 (exact)[1] |
1900-01-04 00:00:00 | Berg im Gau, Bayern, Germany[1] | 48.6360, 11.2449 (exact)[1] |
1900-01-05 00:00:00 | Landkreis Neuburg-Schrobenhausen, Bavaria, Germany[1][4] | 48.6360, 11.2449 (approximate)[1][4] |
The map below shows the locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 1.23 1.24 1.25 "Aktuelle Einheitenübersicht". MaStR marktstammdatenregister. September 23, 2021. Archived from the original on September 21, 2021. Retrieved October 4, 2021.
- ↑ 2.0 2.1 2.2 2.3 2.4 2.5 https://solarsolutions.delta-emea.com/en/Berg-im-Gau-Germany-1926.htm.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 https://www.pv-magazine.com/2021/09/20/anumar-switches-on-southern-germanys-largest-solar-park/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 4.5 https://renewablesnow.com/news/anumar-commissions-120-mwp-solar-park-in-southern-germany-754508/.
{{cite web}}
: Missing or empty|title=
(help)