Schornhof solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Solarpark Schornhof solar project
Schornhof solar farm is an operating solar photovoltaic (PV) farm in Landkreis Neuburg-Schrobenhausen, Bavaria, Germany.
Project Details
Table 1: Phase-level project details for Schornhof solar farm
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
1-1 | Operating[1] | 2020[1] | 20.4 MWp/dc[1] | PV[1] | Anumar [100%][2] | Anumar[1] |
1-2 | Operating[1] | 2021[1] | 21.8 MWp/dc[1] | PV[1] | Anumar [100%][2] | Anumar[1] |
1-3 | Operating[1] | 2021[1] | 20.9 MWp/dc[1] | PV[1] | Anumar [100%][2] | Anumar[1] |
1-4 | Operating[3] | 2021[3] | 57 MWp/dc[4] | PV[1] | Anumar [100%][2] | Anumar[1] |
1-5 | Operating[1] | 2023[1] | 65 MWac[1] | PV[5] | Anumar [100%][5] | Anumar[1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Schornhof solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1-1 | Landkreis Neuburg-Schrobenhausen, Bavaria, Germany[1] | 48.6530, 11.2762 (exact)[1] |
1-2 | Landkreis Neuburg-Schrobenhausen, Bavaria, Germany[1] | 48.6387, 11.2790 (exact)[1] |
1-3 | Landkreis Neuburg-Schrobenhausen, Bavaria, Germany[1] | 48.6563, 11.2822 (exact)[1] |
1-4 | Berg im Gau, Bayern, Germany[1] | 48.6360, 11.2449 (exact)[1] |
1-5 | Landkreis Neuburg-Schrobenhausen, Bavaria, Germany[1] | 48.6456, 11.2786 (exact)[1] |
The map below shows the exact locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 1.23 1.24 1.25 1.26 1.27 1.28 1.29 1.30 "Marktstammdatenregister (Market master data register)". Germany Federal Network Agency. 2023-02. Archived from the original on 2024-01-25. Retrieved 2023-02.
{{cite web}}
: Check date values in:|access-date=
and|date=
(help) - ↑ 2.0 2.1 2.2 2.3 https://www.pv-magazine.com/2021/09/20/anumar-switches-on-southern-germanys-largest-solar-park/ https://solarsolutions.delta-emea.com/en/Berg-im-Gau-Germany-1926.htm, https://www.pv-magazine.com/2021/09/20/anumar-switches-on-southern-germanys-largest-solar-park/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 3.0 3.1 https://web.archive.org/web/20240206150326/https://www.pv-magazine.com/2021/09/20/anumar-switches-on-southern-germanys-largest-solar-park/. Archived from the original on 2024-02-06.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240201204906/https://solarsolutions.delta-emea.com/en/Berg-im-Gau-Germany-1926.htm. Archived from the original on 2024-02-01.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 https://web.archive.org/web/20240201205037/https://renewablesnow.com/news/anumar-commissions-120-mwp-solar-park-in-southern-germany-754508/. Archived from the original on 2024-02-01.
{{cite web}}
: Missing or empty|title=
(help)