Semangka hydroelectric plant
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Semangka hydroelectric plant is an operating hydroelectric power plant in Karang Agung, Kec. Semaka, Kabupaten Tanggamus, Lampung, Indonesia.
Project Details
Table 1: Project details for Semangka hydroelectric plant
Status | Commissioning year | Nameplate capacity | Turbines | Technology type | Owner |
---|---|---|---|---|---|
Operating[1] | 2018[1] | 57 MW[2] | 2[2] | Run-of-river[3] | Korea Midland Power Corporation; Posco E&C[2][2] |
Location
Table 2: Location details for Semangka hydroelectric plant
Location | River | Coordinates (WGS 84) |
---|---|---|
Karang Agung, Kec. Semaka, Kabupaten Tanggamus, Lampung, Indonesia[4] | Semangka river[2] | -5.3911, 104.3854 (exact)[4] |
The map below shows the exact location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://www.power-technology.com/news/indonesian-hydropower-plant/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 https://globalrenewablenews.com/article/energy/category/generation/52/738834/hydropower-plant-semangka-in-indonesia-put-into-commercial-operation.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.waterpowermagazine.com/news/indonesias-semangka-plant-in-operation-6895885/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 https://cdm.unfccc.int/Projects/DB/LRQA%20Ltd1389338094.79/view.
{{cite web}}
: Missing or empty|title=
(help)