Semipalatinsk hydroelectric plant
From Global Energy Monitor
| Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Semipalatinsk hydroelectric plant is a hydroelectric power plant in pre-construction in Abay Region, Kazakhstan.
Project Details
Table 1: Project details for Semipalatinsk hydroelectric plant
| Status | Commissioning year | Nameplate capacity | Technology type | Owner |
|---|---|---|---|---|
| Pre-construction[1][2] | 2030 (planned)[1] | 300 MW[1] | Conventional storage[1] | Samruk-Energo JSC (АО «Самрук-Энерго»)[3] |
Location
Table 2: Location details for Semipalatinsk hydroelectric plant
| Location | River | Coordinates (WGS 84) |
|---|---|---|
| Abay Region, Kazakhstan[1] | Irtysh River[1] | 50.3553, 80.8077 (approximate)[1] |
The map below shows the approximate location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 https://hydropowercongress.com/.
{{cite web}}: Missing or empty|title=(help) - ↑ https://qazaqgreen.com/en/news/kazakhstan/2452/.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.linkedin.com/posts/ruslannurmanov_samruk-energy-jsc-intends-to-construct-activity-7077516832806449152-eh25/.
{{cite web}}: Missing or empty|title=(help)
