Semutang-Chittagong Gas Pipeline

From Global Energy Monitor
Part of the
Global Gas Infrastructure Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error

Semutang-Chittagong Gas Pipeline is an operating natural gas pipeline.[1]

Location

The pipeline runs from the Semutang gas field to Chittagong City, Chittagong district.[2]

Loading map...

Project Details

  • Operator: Karnaphuli Gas Distribution Company Limited (KGDCL)[3]
  • Owner: Karnaphuli Gas Distribution Company Limited (KGDCL)[3]
  • Parent company: Petrobangla[3]
  • Capacity: 70 million cubic feet per day[3]
  • Length: 35 mi / 56 km[3]
  • Diameter: 10 inches[3]
  • Status: Operating[3]
  • Start year: 2013[4]
  • Cost:
  • Financing:
  • Associated infrastructure:

Background

The pipeline is operated by KGDCL, a subsidiary of Petrobangla.[1]

Articles and resources

References

  1. ↑ 1.0 1.1 Annual Report, Petrobangla, 2016
  2. ↑ Semutang begins gas supply, bdnews24.com, Dec. 4, 2011
  3. ↑ 3.0 3.1 3.2 3.3 3.4 3.5 3.6 "Annual Report 2021" (PDF). Petrobangla.{{cite web}}: CS1 maint: url-status (link)
  4. ↑ "Completed Project". KGDCL.{{cite web}}: CS1 maint: url-status (link)

Related GEM.wiki articles

Proposed Oil and Gas Pipelines in Bangladesh

External resources

External articles