Semutang-Chittagong Gas Pipeline

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Semutang-Chittagong Gas Pipeline is an operating natural gas pipeline.[1]

Location

The pipeline runs from the Semutang gas field to Chittagong City, Chittagong district.[2]

Loading map...

Project Details

  • Operator: Karnaphuli Gas Distribution Company Limited (KGDCL)[3]
  • Owner: Karnaphuli Gas Distribution Company Limited (KGDCL)[3]
  • Parent company: Petrobangla[3]
  • Capacity: 70 million cubic feet per day[3]
  • Length: 35 mi / 56 km[3]
  • Diameter: 10 inches[3]
  • Status: Operating[3]
  • Start year: 2013[4]
  • Cost:
  • Financing:
  • Associated infrastructure:

Background

The pipeline is operated by KGDCL, a subsidiary of Petrobangla.[1]

Articles and resources

References

  1. 1.0 1.1 Annual Report, Petrobangla, 2016
  2. Semutang begins gas supply, bdnews24.com, Dec. 4, 2011
  3. 3.0 3.1 3.2 3.3 3.4 3.5 3.6 "Annual Report 2021" (PDF). Petrobangla.{{cite web}}: CS1 maint: url-status (link)
  4. "Completed Project". KGDCL.{{cite web}}: CS1 maint: url-status (link)

Related GEM.wiki articles

Proposed Oil and Gas Pipelines in Bangladesh

External resources

External articles