Semutang-Chittagong Gas Pipeline

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Semutang-Chittagong Gas Pipeline is an operating natural gas pipeline.[1]

Location

The pipeline runs from the Semutang gas field to Chittagong City, Chittagong district.[2]

Loading map...

Project Details

  • Operator: Karnaphuli Gas Distribution Company Limited (KGDCL)
  • Parent Company: Petrobangla
  • Current capacity: 70 million cubic feet per day
  • Proposed capacity:
  • Length: 35 mi / 56 km
  • Status: Operating
  • Start Year: 2011

Background

The pipeline is operated by KGDCL, a subsidiary of Petrobangla.[1]

Articles and resources

References

  1. 1.0 1.1 Annual Report, Petrobangla, 2016
  2. Semutang begins gas supply, bdnews24.com, Dec. 4, 2011

Related GEM.wiki articles

Proposed Oil and Gas Pipelines in Bangladesh

External resources

External articles