Seré wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Seré wind farm is a cancelled wind farm in les Piles, Conca de Barberà, Cataluña, Spain.

Project Details

Table 1: Phase-level project details for Seré wind farm

Status Nameplate capacity Type Owner Operator
Cancelled (inferred February 2024) 33.6 MW[1] Onshore[1] Naturgy Energy Group SA [100%][2] Naturgy Energy Group[1]

Location

Table 2: Phase-level location details for Seré wind farm

Location Coordinates (WGS 84)
les Piles, Conca de Barberà, Cataluña, Spain[1] 41.5036, 1.3431 (approximate)[1]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 "Acord sobre la viabilitat de l'emplaçament i pronunciament sobre l'amplitud i el nivell de detall de l'estudi d'impacte ambiental del projecte "Parc Eòlic Seré"". Generalitat de Catalunya. 2020-03-13. Archived from the original on 2024-02-19.
  2. http://dtes.gencat.cat/portalAA/AppJava/document.do?codi=5081c60878de417bbd49a6ab906b6c56 https://www.somsegarra.cat/medi-ambient/noticia/5713/allau-de-nous-projectes-de-parcs-eolics-a-laltipla-segarrenc, http://dtes.gencat.cat/portalAA/AppJava/document.do?codi=5081c60878de417bbd49a6ab906b6c56. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)