Serpin hydroelectric plant
From Global Energy Monitor
| Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Serpin hydroelectric plant is a cancelled hydroelectric power plant in Bulancak, Giresun, Türkiye.
Project Details
Table 1: Project details for Serpin hydroelectric plant
| Status | Nameplate capacity |
|---|---|
| Cancelled[1][2] | 57 MW[1] |
Location
Table 2: Location details for Serpin hydroelectric plant
| Location | River | Coordinates (WGS 84) |
|---|---|---|
| Bulancak, Giresun, Türkiye[3][4] | Serpin Stream[1] | 40.71001, 38.158 (approximate)[3][4] |
The map below shows the approximate location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 https://giresun.csb.gov.tr/serpin-regulatoru-ve-hes-kapasite-artisi-41-60mwm-40-5mwe-den-57-26mwm-56-70mwe-ye-konkasor-tesisi-dahil-duyuru-226.
{{cite web}}: Missing or empty|title=(help) - ↑ https://enerji.dsi.gov.tr/Sayfa/Detay/774.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 https://www.openstreetmap.org/relation/1835981.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 https://giresun.csb.gov.tr/duyuru-serpin-regulatoru-ve-hes-projesi-haber-2749.
{{cite web}}: Missing or empty|title=(help)
