Serpukhov-Kalinin-Leningrad Pipeline
From Global Energy Monitor
| Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Serpukhov-Kalinin-Leningrad Pipeline, also known as Serpukhov-Leningrad (Russian: Газопровод Серпухов - Ленинград) is a gas pipeline in Russia.[1]
Location
The pipeline runs from Serpukhov, Russia, to Kalinin, Russia, to Leningrad, Russia.[1]
Project Details
- Operator: Gazprom[1]
- Owner: Gazprom[1]
- Parent company: Gazprom[1]
- Capacity: 3.7 bcm/year[1][2]
- Length: 803 km[1][2]
- Diameter: 720 mm[1][2]
- Status: Operating[1]
- Start Year: 1959[1][2]
- Cost:
- Financing:
- Associated infrastructure: Krasnodar Krai-Serpukhov Gas Pipeline
Background
Modernization of the pipeline was included in the list of "Planned Transmission Gas Pipelines" issued by the Ministry of Energy of Russia in May 2015 and revised in May 2023.[3] According to the original document, the modernization was expected to begin in 2016 and complete in 2020.[4]
Articles and resources
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 "Газопровод Серпухов - Ленинград". energybase.ru. Retrieved 2022-08-03.
{{cite web}}: CS1 maint: url-status (link) - ↑ 2.0 2.1 2.2 2.3 "Полвека газопроводу Серпухов-Ленинград". St. Petersburg transgaz Gazprom. August 10, 2009. Retrieved August 4, 2023.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Перечень магистральных газопроводов, планируемых для размещения". КонсультантПлюс. May 27, 2023. Retrieved August 4, 2023.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Схема территориального планирования Российской Федерации в области федерального транспорта (в части трубопроводного транспорта)". RG.RU. May 15, 2015. Retrieved August 4, 2023.
{{cite web}}: CS1 maint: url-status (link)
