Shaanxi Steel Group Hanzhong Iron and Steel Co Ltd
From Global Energy Monitor
(Redirected from Shaanxi Steel Group Hanzhong Iron and Steel Co., Ltd. plant)
This article is part of the Global Steel Plant Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Shaanxi Steel Group Hanzhong Iron and Steel Co Ltd (陕钢集团汉中钢铁有限责任公司), also known as Shaanxi Hanzhong Hanjiang Iron and Steel (Group) Co., Ltd., is a blast furnace-basic oxygen furnace (BF-BOF) steel plant operating in Hanzhong, Shaanxi, China.
Location
The map below shows the exact location of the plant in Hanzhong, Shaanxi, China:
- Location: Dingjunshan Town, Mian County, Hanzhong City, Shaanxi Province
- Coordinates (WGS 84): 33.133192, 106.671859 (exact)
Background
In June 2020, the plant's capacity replacement transformation and upgrading project (EAF 75-tonne) was put into operation.[1]
Plant Details
Table 1: General Plant Details
Plant status | Start date | Workforce size |
---|---|---|
Operating[2] | 2009[3] | 3560[2] |
Table 2: Ownership and Parent Company Information
State-owned entity status | Parent company | Parent company GEM ID | Owner | Owner company GEM ID |
---|---|---|---|---|
Partial | Shaanxi Coal and Chemical Industry Co Ltd [85.8%]; Hanzhong Investment Holding Group Co Ltd [8.9%]; other [5.3%] | E100000125511 [85.8%]; E100000125701 [8.9%]; E100000001753 [5.3%] | Shaanxi Steel Group Hanzhong Iron and Steel Co., Ltd.[2] | E100000123197 |
Table 3: Process and Products
Steel product category | Steel products | Steel sector end users | ISO 14001 | ISO 50001 | Main production equipment | Detailed production equipment |
---|---|---|---|---|---|---|
semi-finished; finished rolled[3] | billets, hot-rolled ribbed steel bars, hot-rolled round bars, wire rods, and bars[3] | building and infrastructure; tools and machinery[4] | 2023[4] | 2023[4] | BF, BOF[5] | 2 BOF (120-tonne); 1 EAF (75-tonne)[5] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status* | Basic oxygen furnace steelmaking capacity | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|---|
operating | 3000 TTPA[3][3] | 700 TTPA[6] | 3700 TTPA[3][3][6] |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum)
Capacity operating status* | Blast furnace capacity | Nominal iron capacity (total) |
---|---|---|
operating | 3000 TTPA[7][8] | 3000 TTPA[7][8] |
Blast Furnace Details
Table 6: Blast Furnace Details
Unit name | Status | Announced date | Construction date | Start date | Current size | Current capacity (ttpa) | Decarbonization technology | Most recent relining |
---|---|---|---|---|---|---|---|---|
1 | operating[5] | unknown | unknown | 2011-12-01 00:00:00[8] | 1280 m³[5] | 1180[7] | unknown | unknown |
2 | operating[5] | unknown | unknown | 2012-08-19 00:00:00[9] | 2280 m³[5] | 1820[8] | unknown | 2021-02-20[10] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ "唐钢国际陕西汉中钢铁电炉炼钢项目顺利投产"]唐钢国际工程技术有限公司网,June 19, 2020
- ↑ 2.0 2.1 2.2 https://www.qcc.com/firm/908ac3f55278235456c5aa84a4800ec9.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 3.6 https://web.archive.org/web/20220113231251/http://hanzhongsteel.com/info/2015061510/201506051440397381.shtml. Archived from the original on 13 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 https://web.archive.org/web/20240119064010/http://cx.cnca.cn/CertECloud/result/skipResultList?certNumber=&orgName=%E9%99%95%E9%92%A2%E9%9B%86%E5%9B%A2%E6%B1%89%E4%B8%AD%E9%92%A2%E9%93%81%E6%9C%89%E9%99%90%E8%B4%A3%E4%BB%BB%E5%85%AC%E5%8F%B8&fromIndex=true. Archived from the original on 19 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 5.3 5.4 5.5 https://web.archive.org/web/20220207192044/https://finance.sina.com.cn/money/future/indu/2020-03-02/doc-iimxxstf5776330.shtml. Archived from the original on 07 February 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 6.0 6.1 https://web.archive.org/web/20220119172746/http://www.hanzhong.gov.cn/hzszf/xwzx/mtgz/201901/t20190124_566704.shtml. Archived from the original on 19 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 7.2 (PDF) https://web.archive.org/web/20220224072927/http://www.gov.cn/zhengce/zhengceku/2021-05/07/5605092/files/4362a77483354513be0fc81be53a4a64.pdf. Archived from the original (PDF) on 24 February 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 8.2 8.3 http://www.csteelnews.com/special/1022/cx08052/201908/t20190807_15072.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ http://www.mcc.com.cn/mcc/_132154/_132572/242345/index.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://mp.weixin.qq.com/s?__biz=MzA3Mjk1OTM1NA==&mid=2655041339&idx=8&sn=069f1eea9b334bf08a4d120b6f053fbc&chksm=84a2432eb3d5ca38ffaf7f4e95965de1aa1800c55e3f0983b9a46ce1054aa07d65e95c99ed29&scene=27.
{{cite web}}
: Missing or empty|title=
(help)