Shandan Huacaotan Energy Base power station

From Global Energy Monitor
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Shandan Huacaotan Energy Base power station (山丹县花草滩火风光一体化能源大基地2×100万千瓦煤电项目) is a power station in the pre-permit stage in Laojun Town Huacaotan, Shandan, Zhangye, Gansu, China.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Shandan Huacaotan Energy Base power station Laojun Town Huacaotan, Shandan, Zhangye, Gansu, China 38.603023, 101.409716 (approximate)[1]
Loading map...

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Emergency/Backup
Unit 1 Pre-permit[1] coal: unknown[1] 1000[1] ultra-supercritical[1] False
Unit 2 Pre-permit[1] coal: unknown[1] 1000[1] ultra-supercritical[1] False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 Zhongqixin Industry (Shandan) Electric Power Co Ltd [100%][1] Zhongqixin Industry (Shandan) Electric Power Co Ltd [100.0%]
Unit 2 Zhongqixin Industry (Shandan) Electric Power Co Ltd [100%][1] Zhongqixin Industry (Shandan) Electric Power Co Ltd [100.0%]

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

The project launched comprehensive engineering advisory services with a consulting tender notice in November 2024[2], followed by social stability evaluation public notices in May 2025 confirming the development of two 1000MW-class efficient ultra-supercritical air-cooled units in Huacaotan, Shandan County, Zhangye, under Zhongqixinye (Shandan) Electricity Co., Ltd.[3]. Environmental assessment report service agreements and water logic verification contracts were successfully completed and finalized between June and October 2025 to secure baseline construction readiness[4][5].

Articles and Resources

References

  1. ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 https://manage.gsei.com.cn/html/1337/2025-08-06/content-610728.html. {{cite web}}: Missing or empty |title= (help)
  2. ↑ "山丹县花草滩火风光一体化能源大基地2×100万千瓦煤电项目全过程工程咨询服务招标". 招标中心. 2024-11-22. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  3. ↑ "山丹县花草滩火风光一体化能源大基地2×100万千瓦煤电项目社会稳定风险评估报告编制服务招标". 甘肃经济信息网. 2025-05-16. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  4. ↑ "山丹县花草滩火风光一体化能源大基地2×100万千瓦煤电项目环境影响评价报告编制项目中标". 北极星电力网. 2025-06-16. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  5. ↑ "山丹县花草滩火风光一体化能源大基地2x100万千瓦煤电项目环境影响评价报告第二次中标公告". 全国公共资源交易平台. 2025-10-15. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.