Shandong Haihua Weifang power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Shandong Haihua Weifang power station (潍坊滨海海化能源1×5万千瓦背压机组热电联产项目, 山东海化集团潍坊热电厂) is an operating power station of at least 230-megawatts (MW) in Haihua Street, Hanting District, Weifang, Shandong, China with multiple units, some of which are not currently operating. It is also known as 山东海化集团潍坊热电公司新厂 (New Unit 7, New Unit 8), 山东海化集团潍坊热电公司三电厂 (Unit 3-1, Unit 3-2).
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Shandong Haihua Weifang power station | Haihua Street, Hanting District, Weifang, Shandong, China | 37.130132, 119.032725 (exact)[1] |
Unit-level coordinates (WGS 84):
- New Unit 11, New Unit 7, New Unit 8, Unit 4-1 (Unit 9), Unit 4-2 (Unit 10): 37.130132, 119.032725
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Retired year | Emergency/Backup |
|---|---|---|---|---|---|---|---|---|
| New Unit 11 | Permitted[2] | coal: unknown[3] | 50[2] | subcritical | yes[2] | – | – | False |
| New Unit 7 | Operating[1] | coal: unknown[1][3] | 50[1] | subcritical[1] | yes[1] | – | – | False |
| New Unit 8 | Retired[4] | coal: unknown[3][4] | 50[4] | subcritical[1] | yes[1] | – | 2021[4] | False |
| Unit 4-1 (Unit 9) | Operating[1] | coal: unknown[1][3] | 150[1] | subcritical[1] | yes[1] | 2011 | – | False |
| Unit 4-2 (Unit 10) | Operating[1] | coal: unknown[1][3] | 30[1] | subcritical[1] | yes[1] | – | – | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| New Unit 11 | Shandong Haihua Group Co Ltd Thermal Power Branch [100%][1] | Weifang Investment Group Co Ltd [51.3%]; China Nationasl Salt Industry Corp [30.0%]; Sinochem Holdings Corp Ltd [7.2%]; China Chengtong Holdings Group Ltd [4.4%]; Shandong Caixin Asset Operation Co Ltd [3.7%]; China Guoxin Holding Corp [3.3%] |
| New Unit 7 | Shandong Haihua Group Co Ltd Thermal Power Branch [100%][1] | Weifang Investment Group Co Ltd [51.3%]; China Nationasl Salt Industry Corp [30.0%]; Sinochem Holdings Corp Ltd [7.2%]; China Chengtong Holdings Group Ltd [4.4%]; Shandong Caixin Asset Operation Co Ltd [3.7%]; China Guoxin Holding Corp [3.3%] |
| New Unit 8 | Shandong Haihua Group Co Ltd Thermal Power Branch [100%][1] | Weifang Investment Group Co Ltd [51.3%]; China Nationasl Salt Industry Corp [30.0%]; Sinochem Holdings Corp Ltd [7.2%]; China Chengtong Holdings Group Ltd [4.4%]; Shandong Caixin Asset Operation Co Ltd [3.7%]; China Guoxin Holding Corp [3.3%] |
| Unit 4-1 (Unit 9) | Shandong Haihua Group Co Ltd Thermal Power Branch [100%][1] | Weifang Investment Group Co Ltd [51.3%]; China Nationasl Salt Industry Corp [30.0%]; Sinochem Holdings Corp Ltd [7.2%]; China Chengtong Holdings Group Ltd [4.4%]; Shandong Caixin Asset Operation Co Ltd [3.7%]; China Guoxin Holding Corp [3.3%] |
| Unit 4-2 (Unit 10) | Shandong Haihua Group Co Ltd Thermal Power Branch [100%][1] | Weifang Investment Group Co Ltd [51.3%]; China Nationasl Salt Industry Corp [30.0%]; Sinochem Holdings Corp Ltd [7.2%]; China Chengtong Holdings Group Ltd [4.4%]; Shandong Caixin Asset Operation Co Ltd [3.7%]; China Guoxin Holding Corp [3.3%] |
Project-level captive use details
Project-level coal details
- Coal source(s): domestic
- Permit(s): 鲁发改项审【2025】159号[2]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background on Project
Shandong Haihua Weifang power station was a six-unit coal plant in Shandong Province, owned by Shandong Haihua Group.[5][6][7]
Unit 8 was reportedly retired in 2021.[8]
In 2024, an environmental impact assessment provided details on the plant's existing units.[9]
By 2025, it was reported that a project to upgrade Unit 7 (Unit 3-1) was underway, and no separate Unit 3-3 exists.[10]
In 2025, project details for Unit 11 were published, including a plan to build a new 50MW back-pressure unit to replace existing units.[11] The project received its environmental impact assessment approval in June 2026.[12]
Articles and Resources
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 1.23 1.24 (PDF) http://www.wfbinhai.gov.cn/BHQXXGK/hbfj/202410/P020241030576777416963.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 https://www.doc88.com/p-99820580367709.html.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 3.2 3.3 3.4 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 4.2 4.3 https://news.bjx.com.cn/html/20220127/1201940.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ "山东海化集团有限公司热电三厂主厂房," 2014-11-13
- ↑ "山东海化集团有限公司热电三厂主厂房," CGICOP, 2011-8-8
- ↑ "山东海化集团热电分公司三期扩建工程," 1988.TV, 2011-9-23
- ↑ "141台!山东省2021年下半年淘汰关停燃煤机组的公示," 北极星电力网新闻中心, 2022/1/27
- ↑ "山东海化能源有限公司热力电力分公司三电厂#1机组抽凝改背压项目环境影响报告书" (PDF). Weifang Binhai Economic Development Zone. 2024-05. Retrieved 2026-05-30.
{{cite web}}: Check date values in:|date=(help)CS1 maint: url-status (link) - ↑ "热电分公司三电厂#1机组抽凝改背压项目". WeChat. 2025-08-02. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "潍坊滨海新建1×5万千瓦背压机组热电联产项目". WeChat. 2025-11-05. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "山东省生态环境厅关于潍坊滨海海化能源1×5万千瓦背压机组热电联产项目环境影响报告书的批复". Shandong Provincial Department of Ecology and Environment. 2026-06-09. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.
