Shanggao power station

From Global Energy Monitor
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Shanggao power station (上高发电厂, 赣能股份上高发电厂 (Unit 1 & 2), 陕煤电力上高有限公司2×1000MW清洁煤电扩建项目 (Unit 3 & 4)) is an operating power station of at least 2000-megawatts (MW) in Luzhou, Shanggao County, Yichun, Jiangxi, China with multiple units, some of which are not currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Shanggao power station Luzhou, Shanggao County, Yichun, Jiangxi, China 28.185566, 114.825697 (exact)[1]
Loading map...

Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4: 28.185566, 114.825697

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Emergency/Backup
Phase I Unit 1 Operating[2] coal: unknown[3][4] 1000[3] ultra-supercritical[3] 2025[2] False
Phase I Unit 2 Operating[5][6] coal: unknown[3][4] 1000[3] ultra-supercritical[3] 2025[5][6] False
Phase II Unit 3 Construction[7][8] coal: unknown[8][4] 1000[1] ultra-supercritical[8] False
Phase II Unit 4 Construction[7][8] coal: unknown[8][4] 1000[1] ultra-supercritical[8] False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Phase I Unit 1 Jiangxi Ganneng Shanggao Power Generation Co Ltd [100%][1] Jiangxi Ganneng Co Ltd [90.0%]; China Energy Engineering Corp Ltd [10.0%]
Phase I Unit 2 Jiangxi Ganneng Shanggao Power Generation Co Ltd [100%][1] Jiangxi Ganneng Co Ltd [90.0%]; China Energy Engineering Corp Ltd [10.0%]
Phase II Unit 3 Jiangxi Ganneng Shanggao Power Generation Co Ltd [100%][1] Jiangxi Ganneng Co Ltd [90.0%]; China Energy Engineering Corp Ltd [10.0%]
Phase II Unit 4 Jiangxi Ganneng Shanggao Power Generation Co Ltd [100%][1] Jiangxi Ganneng Co Ltd [90.0%]; China Energy Engineering Corp Ltd [10.0%]

Project-level coal details

  • Coal source(s): domestic
  • Permit(s): 长安华中司发〔2024〕84号[1]

Background

Phase I Unit 1

Construction of Unit 1 continued through 2023 and 2024, with milestones including the first concrete pour, boiler steel hoisting, and cooling tower construction.[9][10][11] The generator stator was lifted in October 2024, and the cooling tower was topped out in December.[12][13]

In 2025, the unit achieved boiler ignition, grid connection, and passed its 168-hour trial run in September.[14][15][16]

Phase I Unit 2

Construction of Unit 2 also advanced in 2023 and 2024, with the boiler steel structure and main building roof completed.[17][18]

The unit reached key milestones in 2025 and 2026, including a successful DCS system energization and boiler blow-out, and passed its 168-hour trial run in December 2025.[19][20][21]

Phase II Unit 3

In early 2024, the project was listed, and its feasibility study was reviewed.[22][23] The project received approval in April 2024.[24]

Throughout the rest of 2024 and into 2025, it progressed through tendering for major equipment and construction contracts.[25][26] The first concrete pour for the main building occurred in September 2025, and the chimney structure was topped out in July 2026.[27][28]

Phase II Unit 4

Construction of Unit 4 progressed in 2026, with the main building reaching key milestones.[29][30]

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Articles and Resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 "陕煤电力上高有限公司2×1000MW清洁煤电扩建项目核准-北极星火力发电网". news.bjx.com.cn. 2024-04-17. Archived from the original on 2024-04-23. Retrieved 2024-04-17.
  2. 2.0 2.1 https://news.bjx.com.cn/html/20250918/1461738.shtml. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 3.5 https://news.bjx.com.cn/html/20221111/1268123.shtml. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 "江西赣能上高项目2号锅炉基础承台及承台梁混凝土完成浇筑-北极星火力发电网". news.bjx.com.cn. Archived from the original on 2024-01-25. Retrieved 2023-11-15.
  6. 6.0 6.1 https://news.bjx.com.cn/html/20251205/1473346.shtml. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 "陕煤2×1000MW清洁煤电扩建项目正式开工". 电力项目圈微信公众平台. 2025-10-01. Archived from the original on 2025-10-07. Retrieved 2025-10-03.
  8. 8.0 8.1 8.2 8.3 8.4 8.5 mp.weixin.qq.com. 2024-02-18 https://web.archive.org/web/20240329054432/https://mp.weixin.qq.com/s/0OoMQXqbPwrQg7LUz3kIZg. Archived from the original on 2024-03-29. Retrieved 2024-03-01. {{cite web}}: Missing or empty |title= (help)
  9. "江西赣能上高2×1000MW清洁煤电项目主体工程正式开工". BeiJiXing (BJX) News. 2023-10-08. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  10. "江西赣能上高2×1000MW清洁煤电项目1号机组锅炉钢架顺利开吊". WeChat. 2023-10-18. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  11. "上高发电项目烟囱外筒壁顺利实现百米节点". BeiJiXing (BJX) News. 2024-03-19. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  12. "1号机组发电机定子顺利吊装就位". BeiJiXing (BJX) News. 2024-10-31. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  13. "江西赣能上高2×1000兆瓦清洁煤电项目1号冷却塔筒壁安全优质施工结顶". BeiJiXing (BJX) News. 2024-12-19. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  14. "江西赣能上高2×1000MW清洁煤电项目1号机组锅炉首次点火一次成功". BeiJiXing (BJX) News. 2025-06-20. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  15. "江西赣能上高2×1000MW清洁煤电项目1号汽轮机组首次满负荷运行". BeiJiXing (BJX) News. 2025-08-04. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  16. "江西赣能上高2×1000兆瓦清洁煤电项目1号机组顺利通过168小时满负荷试运行". WeChat. 2025-09-18. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  17. "江西赣能上高2×1000MW清洁煤电项目2号汽机基座底板大体积混凝土浇筑圆满完成". BeiJiXing (BJX) News. 2023-11-22. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  18. "2号机组主厂房屋面浇筑完成". BeiJiXing (BJX) News. 2024-10-31. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  19. "赣能上高2×100万千瓦煤电项目2号机组DCS系统受电一次成功". WeChat. 2025-04-16. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  20. "江西赣能上高2×1000MW清洁煤电项目2号机组锅炉吹管工作圆满完成". WeChat. 2025-10-18. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  21. "江西赣能上高2×1000MW清洁煤电项目2号机组顺利通过168小时满负荷试运行". WeChat. 2025-12-05. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  22. "陕煤电力上高有限公司2×1000MW清洁煤电扩建项目用地预审与选址的批前公示". Jiangxi Provincial Department of Natural Resources. 2024-01-05. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  23. "陕煤电力上高有限公司2×1000MW机组扩建项目可行性研究报告评审会闭幕". BeiJiXing (BJX) News. 2024-03-04. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  24. "陕煤电力上高有限公司2×1000MW清洁煤电扩建项目核准". BeiJiXing (BJX) News. 2024-04-17. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  25. "中南院中标陕煤电力上高有限公司2×1000MW清洁煤电扩建项目勘察设计". BeiJiXing (BJX) News. 2024-10-09. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  26. "陕煤电力上高有限公司2×1000MW清洁煤电扩建项目五通一平工程招标". BeiJiXing (BJX) News. 2025-01-14. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  27. "陕煤电力上高有限公司2×1000MW清洁煤电扩建项目主厂房第一罐混凝土顺利浇筑". WeChat. 2025-09-27. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  28. "陕煤电力上高有限公司2×1000MW清洁煤电扩建项目烟囱外筒结构顺利封顶". WeChat. 2026-07-02. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  29. "陕煤上高项目2台1000兆瓦机组B标段工程完成2号主厂房"出零米"". WeChat. 2026-02-27. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  30. "陕煤电力上高有限公司2台1000兆瓦清洁煤电扩建工程项目2号主厂房A排结构到顶". WeChat. 2026-05-31. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.