Shanggao power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Shanggao power station (上高发电厂, 赣能股份上高发电厂 (Unit 1 & 2), 陕煤电力上高有限公司2×1000MW清洁煤电扩建项目 (Unit 3 & 4)) is an operating power station of at least 2000-megawatts (MW) in Luzhou, Shanggao County, Yichun, Jiangxi, China with multiple units, some of which are not currently operating.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Shanggao power station | Luzhou, Shanggao County, Yichun, Jiangxi, China | 28.185566, 114.825697 (exact)[1] |
Unit-level coordinates (WGS 84):
- Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4: 28.185566, 114.825697
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Emergency/Backup |
|---|---|---|---|---|---|---|
| Phase I Unit 1 | Operating[2] | coal: unknown[3][4] | 1000[3] | ultra-supercritical[3] | 2025[2] | False |
| Phase I Unit 2 | Operating[5][6] | coal: unknown[3][4] | 1000[3] | ultra-supercritical[3] | 2025[5][6] | False |
| Phase II Unit 3 | Construction[7][8] | coal: unknown[8][4] | 1000[1] | ultra-supercritical[8] | – | False |
| Phase II Unit 4 | Construction[7][8] | coal: unknown[8][4] | 1000[1] | ultra-supercritical[8] | – | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Phase I Unit 1 | Jiangxi Ganneng Shanggao Power Generation Co Ltd [100%][1] | Jiangxi Ganneng Co Ltd [90.0%]; China Energy Engineering Corp Ltd [10.0%] |
| Phase I Unit 2 | Jiangxi Ganneng Shanggao Power Generation Co Ltd [100%][1] | Jiangxi Ganneng Co Ltd [90.0%]; China Energy Engineering Corp Ltd [10.0%] |
| Phase II Unit 3 | Jiangxi Ganneng Shanggao Power Generation Co Ltd [100%][1] | Jiangxi Ganneng Co Ltd [90.0%]; China Energy Engineering Corp Ltd [10.0%] |
| Phase II Unit 4 | Jiangxi Ganneng Shanggao Power Generation Co Ltd [100%][1] | Jiangxi Ganneng Co Ltd [90.0%]; China Energy Engineering Corp Ltd [10.0%] |
Project-level coal details
- Coal source(s): domestic
- Permit(s): 长安华中司发〔2024〕84号[1]
Background
Phase I Unit 1
Construction of Unit 1 continued through 2023 and 2024, with milestones including the first concrete pour, boiler steel hoisting, and cooling tower construction.[9][10][11] The generator stator was lifted in October 2024, and the cooling tower was topped out in December.[12][13]
In 2025, the unit achieved boiler ignition, grid connection, and passed its 168-hour trial run in September.[14][15][16]
Phase I Unit 2
Construction of Unit 2 also advanced in 2023 and 2024, with the boiler steel structure and main building roof completed.[17][18]
The unit reached key milestones in 2025 and 2026, including a successful DCS system energization and boiler blow-out, and passed its 168-hour trial run in December 2025.[19][20][21]
Phase II Unit 3
In early 2024, the project was listed, and its feasibility study was reviewed.[22][23] The project received approval in April 2024.[24]
Throughout the rest of 2024 and into 2025, it progressed through tendering for major equipment and construction contracts.[25][26] The first concrete pour for the main building occurred in September 2025, and the chimney structure was topped out in July 2026.[27][28]
Phase II Unit 4
Construction of Unit 4 progressed in 2026, with the main building reaching key milestones.[29][30]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 "陕煤电力上高有限公司2×1000MW清洁煤电扩建项目核准-北极星火力发电网". news.bjx.com.cn. 2024-04-17. Archived from the original on 2024-04-23. Retrieved 2024-04-17.
- ↑ 2.0 2.1 https://news.bjx.com.cn/html/20250918/1461738.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 https://news.bjx.com.cn/html/20221111/1268123.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 4.2 4.3 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ 5.0 5.1 "江西赣能上高项目2号锅炉基础承台及承台梁混凝土完成浇筑-北极星火力发电网". news.bjx.com.cn. Archived from the original on 2024-01-25. Retrieved 2023-11-15.
- ↑ 6.0 6.1 https://news.bjx.com.cn/html/20251205/1473346.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 7.0 7.1 "陕煤2×1000MW清洁煤电扩建项目正式开工". 电力项目圈微信公众平台. 2025-10-01. Archived from the original on 2025-10-07. Retrieved 2025-10-03.
- ↑ 8.0 8.1 8.2 8.3 8.4 8.5 mp.weixin.qq.com. 2024-02-18 https://web.archive.org/web/20240329054432/https://mp.weixin.qq.com/s/0OoMQXqbPwrQg7LUz3kIZg. Archived from the original on 2024-03-29. Retrieved 2024-03-01.
{{cite web}}: Missing or empty|title=(help) - ↑ "江西赣能上高2×1000MW清洁煤电项目主体工程正式开工". BeiJiXing (BJX) News. 2023-10-08. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "江西赣能上高2×1000MW清洁煤电项目1号机组锅炉钢架顺利开吊". WeChat. 2023-10-18. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "上高发电项目烟囱外筒壁顺利实现百米节点". BeiJiXing (BJX) News. 2024-03-19. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "1号机组发电机定子顺利吊装就位". BeiJiXing (BJX) News. 2024-10-31. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "江西赣能上高2×1000兆瓦清洁煤电项目1号冷却塔筒壁安全优质施工结顶". BeiJiXing (BJX) News. 2024-12-19. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "江西赣能上高2×1000MW清洁煤电项目1号机组锅炉首次点火一次成功". BeiJiXing (BJX) News. 2025-06-20. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "江西赣能上高2×1000MW清洁煤电项目1号汽轮机组首次满负荷运行". BeiJiXing (BJX) News. 2025-08-04. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "江西赣能上高2×1000兆瓦清洁煤电项目1号机组顺利通过168小时满负荷试运行". WeChat. 2025-09-18. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "江西赣能上高2×1000MW清洁煤电项目2号汽机基座底板大体积混凝土浇筑圆满完成". BeiJiXing (BJX) News. 2023-11-22. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "2号机组主厂房屋面浇筑完成". BeiJiXing (BJX) News. 2024-10-31. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "赣能上高2×100万千瓦煤电项目2号机组DCS系统受电一次成功". WeChat. 2025-04-16. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "江西赣能上高2×1000MW清洁煤电项目2号机组锅炉吹管工作圆满完成". WeChat. 2025-10-18. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "江西赣能上高2×1000MW清洁煤电项目2号机组顺利通过168小时满负荷试运行". WeChat. 2025-12-05. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "陕煤电力上高有限公司2×1000MW清洁煤电扩建项目用地预审与选址的批前公示". Jiangxi Provincial Department of Natural Resources. 2024-01-05. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "陕煤电力上高有限公司2×1000MW机组扩建项目可行性研究报告评审会闭幕". BeiJiXing (BJX) News. 2024-03-04. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "陕煤电力上高有限公司2×1000MW清洁煤电扩建项目核准". BeiJiXing (BJX) News. 2024-04-17. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "中南院中标陕煤电力上高有限公司2×1000MW清洁煤电扩建项目勘察设计". BeiJiXing (BJX) News. 2024-10-09. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "陕煤电力上高有限公司2×1000MW清洁煤电扩建项目五通一平工程招标". BeiJiXing (BJX) News. 2025-01-14. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "陕煤电力上高有限公司2×1000MW清洁煤电扩建项目主厂房第一罐混凝土顺利浇筑". WeChat. 2025-09-27. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "陕煤电力上高有限公司2×1000MW清洁煤电扩建项目烟囱外筒结构顺利封顶". WeChat. 2026-07-02. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "陕煤上高项目2台1000兆瓦机组B标段工程完成2号主厂房"出零米"". WeChat. 2026-02-27. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "陕煤电力上高有限公司2台1000兆瓦清洁煤电扩建工程项目2号主厂房A排结构到顶". WeChat. 2026-05-31. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.