Shanghai Petrochem cogen power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Shanghai Petrochem cogen power station (中石化上海石化热电厂) is an operating power station of at least 400-megawatts (MW) in Jinshan, Shanghai, China with multiple units, some of which are not currently operating. It is also known as Jinshan Petrochem power station 金山石化热电厂, Shanghai Jinshan-1 power station.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Shanghai Petrochem cogen power station | Jinshan, Shanghai, China | 30.698076, 121.277792 (exact) |
Unit-level coordinates (WGS 84):
- Replace Unit 1, Replace Unit 2, Replace Unit 3, Replace Unit 4, Unit 1, Unit 2, Unit 3, Unit 4, Unit 5, Unit 6: 30.698076, 121.277792
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Emergency/Backup |
|---|---|---|---|---|---|---|---|
| Replace Unit 1 | Construction[1][2] | coal: unknown[3][4] | 70[4] | subcritical[2] | yes[4] | 2026 (planned)[5][6] | False |
| Replace Unit 2 | Construction[2] | coal: unknown[3][4] | 70[4] | subcritical[4] | yes[4] | 2026 (planned)[5] | False |
| Replace Unit 3 | Construction[2] | coal: unknown[3][4] | 70[4] | subcritical[2] | yes[4] | 2026 (planned)[4] | False |
| Replace Unit 4 | Construction[2] | coal: unknown[3][4] | 70[4] | subcritical[2] | yes[4] | 2026 (planned)[5] | False |
| Unit 1 | Operating | coal: unknown[3] | 50 | subcritical | yes | 1991 | False |
| Unit 2 | Operating | coal: unknown[3] | 50 | subcritical | yes | 1992 | False |
| Unit 3 | Operating | coal: unknown[3] | 50 | subcritical | yes | 1992 | False |
| Unit 4 | Operating | coal: unknown[3] | 50 | subcritical | yes | 1993 | False |
| Unit 5 | Operating | coal: unknown[3] | 100 | subcritical | yes | 2002 | False |
| Unit 6 | Operating | coal: unknown[3] | 100 | subcritical | yes | 2011 | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Replace Unit 1 | Sinopec Shanghai Petrochemical Co Ltd [100%] | Sinopec Shanghai Petrochemical Co Ltd [100.0%] |
| Replace Unit 2 | Sinopec Shanghai Petrochemical Co Ltd [100%] | Sinopec Shanghai Petrochemical Co Ltd [100.0%] |
| Replace Unit 3 | Sinopec Shanghai Petrochemical Co Ltd [100%] | Sinopec Shanghai Petrochemical Co Ltd [100.0%] |
| Replace Unit 4 | Sinopec Shanghai Petrochemical Co Ltd [100%] | Sinopec Shanghai Petrochemical Co Ltd [100.0%] |
| Unit 1 | Sinopec Shanghai Petrochemical Co Ltd [100%] | Sinopec Shanghai Petrochemical Co Ltd [100.0%] |
| Unit 2 | Sinopec Shanghai Petrochemical Co Ltd [100%] | Sinopec Shanghai Petrochemical Co Ltd [100.0%] |
| Unit 3 | Sinopec Shanghai Petrochemical Co Ltd [100%] | Sinopec Shanghai Petrochemical Co Ltd [100.0%] |
| Unit 4 | Sinopec Shanghai Petrochemical Co Ltd [100%] | Sinopec Shanghai Petrochemical Co Ltd [100.0%] |
| Unit 5 | Sinopec Shanghai Petrochemical Co Ltd [100%] | Sinopec Shanghai Petrochemical Co Ltd [100.0%] |
| Unit 6 | Sinopec Shanghai Petrochemical Co Ltd [100%] | Sinopec Shanghai Petrochemical Co Ltd [100.0%] |
Project-level captive use details
- Captive industry use (heat or power): both
- Captive industry: Chemicals
Project-level coal details
- Coal source(s): domestic/imported
- Permit(s): 沪发改能源〔2023〕249号
Background
Replacement Units 1‑4 are under construction. In 2023, the project was approved and a groundbreaking ceremony was held, with the project appearing on Shanghai's key projects list in 2024.[7][8][9]
In 2024, an EPC contract was signed, and the first concrete was poured in August.[10][11]
In 2025, the project was progressing toward completion by 2026, with major milestones like boiler installation and chimney topping achieved.[12]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Articles and Resources
References
- ↑ "上海石化热电机组清洁提效改造主体工程开工-北极星火力发电网". news.bjx.com.cn. 2024-09-03. Archived from the original on 2025-01-31. Retrieved 2024-09-12.
- ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 "上海石化热电机组清洁提效改造工程设计采购施工(BEPC)总承包项目招标公告_中国电力招标网". www.dlzb.com. 2023-02-01. Archived from the original on 2024-01-25. Retrieved 2023-12-01.
- ↑ 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.00 4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 4.10 4.11 4.12 4.13 "上海石化4×70MW清洁高效热电联产机组开工-北极星火力发电网". news.bjx.com.cn. 2023-11-20. Archived from the original on 2024-01-25. Retrieved 2023-12-01.
- ↑ 5.0 5.1 5.2 "上海石化开工建设清洁高效热电联产机组". spc.sinopec.com. 2023-11-21. Archived from the original on 2024-01-25. Retrieved 2023-12-01.
{{cite web}}: Text "上海石化" ignored (help) - ↑ https://english.shanghai.gov.cn/nw4411/20231119/8df003c7a2cb4db7becd02de0c07bc55.html.
{{cite web}}: Missing or empty|title=(help) - ↑ "上海石化热电机组清洁提效改造工程项目核准". 上海市发改委. 2023-11-07. Retrieved 2026-07-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "上海石化4×70MW清洁高效热电联产机组开工". 北极星电力网. 2023-11-20. Retrieved 2026-07-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "2024年上海市重大工程清单". 上海市人民政府. 2024-02-19. Retrieved 2026-07-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "中国能建江苏院与中国石化上海石油化工股份有限公司签署上海石化热电机组清洁提效改造项目EPC总承包合同". 微信公众号. 2024-07-08. Retrieved 2026-07-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "上海石化热电机组清洁提效改造工程项目第一方混凝土顺利浇筑". 微信公众号. 2024-08-31. Retrieved 2026-07-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "上海石化热电机组清洁提效改造工程扎实推进,已完成燃气炉主体安装、烟囱封顶等关键节点". 微信公众号. 2025-12-31. Retrieved 2026-07-30.
{{cite web}}: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.