Shangrao power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Shangrao power station (国家电投上饶发电厂) is an operating power station of at least 2000-megawatts (MW) in Chating Town, Quanjiajing, Shangrao, Jiangxi, China.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Shangrao power station | Chating Town, Quanjiajing, Shangrao, Jiangxi, China | 28.282277, 117.862082 (exact)[1] |
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2: 28.282277, 117.862082
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Emergency/Backup |
|---|---|---|---|---|---|---|
| Unit 1 | Operating[2][3] | coal: unknown[4][5] | 1000[5] | ultra-supercritical[5] | 2025[2][3] | False |
| Unit 2 | Operating[2][6] | coal: unknown[4][5] | 1000[5] | ultra-supercritical[5] | 2026[2][6] | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Unit 1 | State Power Investment Group Jiangxi Electric Power Co Ltd [100%] | State Power Investment Corp Ltd [54.3%]; Ping An Life Insurance Co Ltd [38.5%]; Ping An Insurance (Group) Company of China Ltd [7.2%]; unknown [0.0%] |
| Unit 2 | State Power Investment Group Jiangxi Electric Power Co Ltd [100%] | State Power Investment Corp Ltd [54.3%]; Ping An Life Insurance Co Ltd [38.5%]; Ping An Insurance (Group) Company of China Ltd [7.2%]; unknown [0.0%] |
Project-level coal details
- Coal source(s): domestic
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background on Project
CPI proposed a 2 x 1,000 MW coal plant for Quanjiajing.[7]
Jiangxi Provincial Department of Environmental Protection was considering approving the project's EIA in May 2017.[8]
The project appeared in the Jiangxi Province Development Plan of the Railway Economic Belt (2019-2025).[9]
By September 2022, the power station was permitted.[10]
Both units are operational. In 2023, the project began construction, and in 2024, the first concrete was poured.[11] In 2025 and 2026, the project progressed through various milestones, with Unit 1 commissioned in early 2026 and Unit 2 following in March 2026.[12][13]
Coal source
The plant's coal source would be from the Shanxi Pingshuo Mine area, the Shaanxi Shenfu Dongsheng Mine area, and the Shanxi Datong Mine area. The coal will be transported by train to Qinhuangdao Port or Huanghua Port, then transported by ship to Fujian Fuzhou Port or Zhejiang Wenzhou Port, and then transported by train again to the power plant site.[8]
Ownership
In July 2015, China Power Investment Corporation (CPI) and State Nuclear Power Technology Corporation (SNPTC) merged to become State Power Investment Corporation (国家电力投资集团), one of the five largest state-owned electricity producers in the People's Republic of China.[14]
Articles and Resources
References
- ↑ https://mp.weixin.qq.com/s/_36X5xnGB7l-z-SrDdxnlA.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 https://mp.weixin.qq.com/s/_gYJoIaaPL-A5Dq0a2H2Lg.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 https://news.bjx.com.cn/html/20260104/1477717.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ 5.0 5.1 5.2 5.3 5.4 5.5 https://www.china5e.com/news/news-1140269-1.html.
{{cite web}}: Missing or empty|title=(help) - ↑ 6.0 6.1 https://news.bjx.com.cn/html/20260326/1489375.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ "国家电投江西上饶发电厂新建工程环境影响评价第一次公示," 2016-03-31
- ↑ 8.0 8.1 "江西省环保厅拟批准国家电投江西上饶发电厂2×1000MW级新建工程," 来源:北极星电力网, 2017/5/15
- ↑ "江西省人民政府关于印发江西省高铁经济带发展规划(2019-2025年)的通知," Jiangxi government, 2019-10-08
- ↑ "国家电投江西上饶发电厂2×1000MW项目获得核准," China5e, 2022-09-09
- ↑ "上饶发电厂开工暨上饶市"八大工程"项目集中开(竣)工活动举行". 北极星电力网. 2024-01-02. Retrieved 2026-07-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "上饶发电1号机组一次性高质量通过168小时满负荷试运". 微信公众号. 2026-01-05. Retrieved 2026-07-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "山东电建三公司承建的江西上饶发电厂2×1000MW级超超临界机组新建工程2号机组圆满完成168小时满负荷试运行". 微信公众号. 2026-03-25. Retrieved 2026-07-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Chinese nuclear giant officially launched". World Nuclear Association. 16 July 2015. Retrieved 4 May 2015.
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.
