Shenmu Shenxin power station (信发神木神信热电厂) is a power station under construction in Jinjie, Shenmu, Yulin, Shaanxi, China. It is also known as 神木神信热电2x660MW发电工程.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Shenmu Shenxin power station Jinjie, Shenmu, Yulin, Shaanxi, China 38.688762, 110.239962 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2: 38.688762, 110.239962

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Unit 1 construction coal - unknown 660 ultra-supercritical 2024
Unit 2 construction coal - unknown 660 ultra-supercritical 2024

Table 3: Unit-level ownership and operator details

Unit name Owner
Unit 1 Shenmu Shenxin Thermal Power Co Ltd [100.0%]
Unit 2 Shenmu Shenxin Thermal Power Co Ltd [100.0%]

Project-level coal details

  • Permit(s): April 2022, February 5, 2021 – 陕发改能电力〔2021〕196号[1]

Background on Project

Shenmu Shenxin power station is a proposed 2 x 660 MW coal plant in Jinjie Town (Jinjiezhen), Shenmu County. Unit 1 was permitted for construction in February 2021.[2][3] In March 2022, a permitting quota for one 660 MW unit which belonged to Hengli Energy was transferred to the proposed power project. [4] By April 2022, it appeared both units were permitted (陕发改能电力[2022]557 号). In August 2022, the Environmental Impact Assessment report for both units had also been approved.[5][6]

Construction reportedly began in September 2022,[7] and by November 2022, the supercritical project's ground foundation was nearly complete.[8] In July 2023, reports stated that construction was still in full swing.[9] Planet satellite imagery showed significant progress in the power station's construction from January to July of 2023.

The power project was expected to be ready for operation in February 2024.[7]

Articles and Resources

References

  1. "关于神木神信电厂首台机组核准的批复". sndrc.shaanxi.gov.cn. 2021-02-05. Retrieved 2023-11-22.
  2. "660MW!神木神信电厂首台机组获得核准批复" 北极星电力网新闻中心, 2021/4/29
  3. 陕西省发展和改革委员会关于神木神信热电有限公司首台1×660MW超超临界机组项目节能报告的审查意见 Shaanxi Provincial Development and Reform Commission, 2021-08-06
  4. 关于榆神恒力电厂首台机组调整建设的公示 Shaanxi Government, 2022-03-03
  5. 关于神木神信热电有限公司2×660MW发电工程环境影响报告书的批复 Sohu, 2022-08-09
  6. 关于神木神信电厂第二台66 万千瓦机组核准的批复 Xinfa Group, April 2022
  7. 7.0 7.1 陕北最高的间冷塔!预计2024年2月具备运转条件 Yiyouliao, accessed: July 2023
  8. 【一线动态】神木神信热电有限公司2×660MW发电工程基础施工进入尾声 陕西建工, 2022-11-04
  9. 【项目】火电|2×1000MW!襄阳宜城首台机组通过168!/2x660MW!神木神信电厂建设如火如荼 MP Weixin, 2023-07-15