Shennan Power Dongguan Gaobu Natural Gas power station

From Global Energy Monitor
Part of the
Global Oil and Gas Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Shennan Power Dongguan Gaobu Natural Gas power station (深南电东莞高埗天然气电厂) is an operating power station of at least 360-megawatts (MW) in Dongguan, Guangdong, China with multiple units, some of which are not currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Shennan Power Dongguan Gaobu Natural Gas power station Dongguan, Guangdong, China 23.1267, 113.75539 (exact)[1]

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Unit 1-1, Unit 1-2, Unit 2-1, Unit 2-2: 23.1267, 113.75539

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Retired year
Unit 1-1 operating[2] liquefied natural gas[3][2] 180[2] combined cycle[2] yes[3] 2006[2]
Unit 1-2 operating[2] liquefied natural gas[3][2] 180[2] combined cycle[2] yes[3] 2006[2]
Unit 2-1 construction[4] liquefied natural gas[3][5] 470[5][6] combined cycle[5] yes[7] 2024[4]
Unit 2-2 construction[4] liquefied natural gas[3][5] 470[5][6] combined cycle[5] yes[5] 2025[8][9]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1-1 Dongguan Shenran Natural Gas Thermal Power Co., Ltd.[1][10] Shenzhen Gas Corporation Ltd. [95.4%]; other [4.6%]
Unit 1-2 Dongguan Shenran Natural Gas Thermal Power Co., Ltd.[1][10] Shenzhen Gas Corporation Ltd. [95.4%]; other [4.6%]
Unit 2-1 Dongguan Shenran Natural Gas Thermal Power Co., Ltd.[1][11] Shenzhen Gas Corporation Ltd. [95.4%]; other [4.6%]
Unit 2-2 Dongguan Shenran Natural Gas Thermal Power Co., Ltd.[1][11] Shenzhen Gas Corporation Ltd. [95.4%]; other [4.6%]

Background

The station was once called Dongguan Weimei power station and operated with oil fuel.[12]

The first-phase (Unit 1-1 and 1-2) of Shennan Power Dongguan Gaobu Natural Gas power station project (深南电东莞高埗天然气电厂)was completed in 2006, and it only began normal operation after receiving approval from the Guangdong Provincial Development and Reform Commission on January 14, 2016. [13]The power generation fuel used is clean energy, LNG natural gas.[14]

The second phase(Unit 2-1 and 2-2) of the project officially started construction on November 28, 2022. It is expected to commence operation in the first half of 2024.[15]

Articles and Resources

References

  1. 1.0 1.1 1.2 1.3 1.4 https://www.qcc.com/firm/63S93MY.shtml. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 https://m.bjx.com.cn/mnews/20160120/702921.shtml. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 3.5 https://web.archive.org/web/20210603230733/https://www.sohu.com/a/324898042_99904802. Archived from the original on 03 June 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  4. 4.0 4.1 4.2 https://web.archive.org/web/20230205140830/https://dg.focus.cn/zixun/02e54250d28d1e5c.html. Archived from the original on 05 February 2023. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 5.4 5.5 5.6 https://web.archive.org/web/20220516085243/https://dg.leju.com/news/2022-03-07/07006906208769290854300.shtml. Archived from the original on 16 May 2022. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 (PDF) https://web.archive.org/web/20220418213634/http://www.cnbayarea.org.cn/attachment/0/9/9529/878530.pdf. Archived from the original (PDF) on 18 April 2022. {{cite web}}: Missing or empty |title= (help)
  7. https://web.archive.org/web/20220708184038/https://dg.leju.com/news/2022-03-07/07006906208769290854300.shtml%EF%BC%8Chttps://news.bjx.com.cn/html/20220507/1222935.shtml. Archived from the original on 08 July 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  8. https://m.bjx.com.cn/mnews/20220126/1201602.shtml. {{cite web}}: Missing or empty |title= (help)
  9. http://www.dg.gov.cn/dggbz/gkmlpt/content/3/3732/post_3732095.html#2133. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 https://web.archive.org/web/20211121051617/https://news.bjx.com.cn/html/20180906/926153.shtml. Archived from the original on 21 November 2021. {{cite web}}: Missing or empty |title= (help)
  11. 11.0 11.1 https://web.archive.org/web/20220418192448/http://weixin.gzggzy.cn/xmxqwinfo/index.jhtml?id=573933. Archived from the original on 18 April 2022. {{cite web}}: Missing or empty |title= (help)
  12. "深南电A:2020年年度报告," 新浪财经, 2021/03/26
  13. "深南电高埗天然气电厂燃气蒸汽联合循环发电项目获广东省发改委核准批复". 2016-01-20. Retrieved 2023-11-02.{{cite web}}: CS1 maint: url-status (link)
  14. "深南电(东莞)唯美电力有限公司70%股权意向征集公告". 2019-07-04. Retrieved 2023-11-02.{{cite web}}: CS1 maint: url-status (link)
  15. "高埗镇一省重点建设项目迎来新进展!". 2022-11-29. Retrieved 2023-11-02.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.