30em

📝 Help us learn how people like you use GEM Wiki! Take this short survey!📝

Data will be retained following our Privacy Policy. The survey is completed in Google Forms (Privacy policy and Terms of Service)

Shenzhen Energy Fengda Gas Thermal power station

From Global Energy Monitor
Part of the
Global Oil and Gas Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Shenzhen Energy Fengda Gas Thermal power station (深能丰达天然气热电厂 (Unit 1-1, Unit 1-2), 丰达电厂三期 (Units 3-1, 3-2, 3-3), 惠州丰达电厂二期扩建项目 (Units 2-1, 2-2)) is an operating power station of at least 1280-megawatts (MW) in Jinda Road, High-Tech Industrial Park, Huinan, Huizhou, Guangdong, China with multiple units, some of which are not currently operating. It is also known as Huizhou Fengda power station.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Shenzhen Energy Fengda Gas Thermal power station Jinda Road, High-Tech Industrial Park, Huinan, Huizhou, Guangdong, China 22.982217, 114.488468 (exact)[1]

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • 1-1, 1-2, 2-1, 2-2, 3-1, 3-2, 3-3: 22.982217, 114.488468

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year
1-1 Operating[2] fossil gas: natural gas[2] 180[3] combined cycle[3] yes[2] 2005[2]
1-2 Operating[2] fossil gas: natural gas[2] 180[3] combined cycle[3] yes[2] 2005[2]
2-1 Operating[4] fossil gas: natural gas[5] 460[5] combined cycle[6] yes[7] 2023[4]
2-2 Operating[4] fossil gas: natural gas[5] 460[8] combined cycle[6] yes[7] 2023[4]
3-1 Pre-construction[9] fossil gas: natural gas[10] 460[11][10] gas turbine[12][11] yes[11]
3-2 Pre-construction[9] fossil gas: natural gas[10] 460[11][10] gas turbine[11][13] yes[11]
3-3 Pre-construction[9] fossil gas: natural gas[10] 460[11][10] gas turbine[11][13] yes[11]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
1-1 Huizhou Shenneng Fengda Power Co Ltd [100%][11][14] Shenzhen Energy Group Co Ltd [96.6%]; unknown [3.4%]
1-2 Huizhou Shenneng Fengda Power Co Ltd [100%][11][14] Shenzhen Energy Group Co Ltd [96.6%]; unknown [3.4%]
2-1 Huizhou Shenneng Fengda Power Co Ltd [100%][11][14] Shenzhen Energy Group Co Ltd [96.6%]; unknown [3.4%]
2-2 Huizhou Shenneng Fengda Power Co Ltd [100%][11][14] Shenzhen Energy Group Co Ltd [96.6%]; unknown [3.4%]
3-1 Huizhou Shenneng Fengda Power Co Ltd [100%][11][14] Shenzhen Energy Group Co Ltd [96.6%]; unknown [3.4%]
3-2 Huizhou Shenneng Fengda Power Co Ltd [100%][11][14] Shenzhen Energy Group Co Ltd [96.6%]; unknown [3.4%]
3-3 Huizhou Shenneng Fengda Power Co Ltd [100%][11][14] Shenzhen Energy Group Co Ltd [96.6%]; unknown [3.4%]

Background

The Phase I project (Unit 1-1 and Unit 1-2) of Shenzhen Energy Fengda Gas Thermal power station (深能丰达天然气热电厂) commenced construction in April 2004, and in December 2005, both units were put into full operation. In 2018, centralized heating was provided to the Huinan High-Tech Industrial Park and the surrounding industrial zones and industrial clusters.[15]

The Phase II project (Unit 2-1 and Unit 2-2) was approved by the Guangdong Provincial Development and Reform Commission on November 22, 2019. [16]The Phase II project officially started construction on October 28, 2021, and it was put into formal operation on August 30, 2023.[17]

Articles and Resources

References

  1. https://web.archive.org/web/20221204120558/https://www.sec.com.cn/queryMemberById.do?id=74. Archived from the original on 2022-12-04. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 https://web.archive.org/web/20211127121133/https://news.bjx.com.cn/html/20180906/926153-4.shtml. Archived from the original on 2021-11-27. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 https://web.archive.org/web/20211121051617/https://news.bjx.com.cn/html/20180906/926153.shtml. Archived from the original on 2021-11-21. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 https://m.bjx.com.cn/mnews/20230901/1329346.shtml. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 https://web.archive.org/web/20220407221912/https://news.bjx.com.cn/html/20191129/1024539.shtml. Archived from the original on 2022-04-07. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 https://web.archive.org/web/20211101193637/http://drc.gd.gov.cn/xmgg/content/post_3228888.html. Archived from the original on 2021-11-01. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 http://www.huizhou.cn/news/newsc_counties/newsc_hz/202305/t20230508_1522620.htm. {{cite web}}: Missing or empty |title= (help)
  8. https://web.archive.org/web/20210927182552/https://news.bjx.com.cn/html/20210616/1158565.shtml. Archived from the original on 2021-09-27. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 9.2 http://www.hznews.com/topnew/202305/t20230508_1522626.shtml. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 10.2 10.3 10.4 10.5 https://web.archive.org/web/20230331072543/http://drc.gd.gov.cn/ywtz/content/post_4137123.html. Archived from the original on 2023-03-31. {{cite web}}: Missing or empty |title= (help)
  11. 11.00 11.01 11.02 11.03 11.04 11.05 11.06 11.07 11.08 11.09 11.10 11.11 11.12 11.13 11.14 11.15 https://archive.org/details/2024_20240429. {{cite web}}: Missing or empty |title= (help)
  12. "广东省2023年重点建设项目计划表" (PDF). Archived from the original (PDF) on 2024-05-06. Retrieved 2024-04-23.
  13. 13.0 13.1 https://www.huizhou.gov.cn/zwgk/wgk/zxgk/zxgcgk/content/mpost_4936174.html. {{cite web}}: Missing or empty |title= (help)
  14. 14.0 14.1 14.2 14.3 14.4 14.5 14.6 (PDF) http://jhj.huizhou.gov.cn/attachment/0/247/247774/5226945.pdf. {{cite web}}: Missing or empty |title= (help)
  15. "广东省57家燃机发电项目 136台机组汇总". 2018-09-06. Retrieved 2023-11-03.{{cite web}}: CS1 maint: url-status (link)
  16. "2×460MW!惠州丰达电厂二期天然气发电扩建项目获核准". 2019-11-29. Retrieved 2023-11-03.{{cite web}}: CS1 maint: url-status (link)
  17. "深能丰达电厂二期扩建工程如期全面投产!". 2023-09-01. Retrieved 2023-11-03.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.