Shenzhen Energy Hongwan Gas power station (洪湾二期天然气热电联产项目(2-1,2-2), 深能洪湾燃机电厂, 珠海洪湾燃机发电厂) is an operating power station of at least 360-megawatts (MW) in Xiangzhou, Hongwan, Zhuhai, Guangdong, China with multiple units, some of which are not currently operating. It is also known as Zhuhai Shenneng Hongwan Electric Power.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Shenzhen Energy Hongwan Gas power station Xiangzhou, Hongwan, Zhuhai, Guangdong, China 22.174941, 113.472906 (exact)[1]

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • 2-1, 2-2, 4, 5: 22.174941, 113.472906

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year
2-1 Construction[2][3][4][5] fossil gas: natural gas[2] 400[2] combined cycle[2][6] yes[2] 2025 (planned)[5]
2-2 Construction[2][4][5] fossil gas: natural gas[2] 400[2] combined cycle[2][6] yes[2] 2025 (planned)[5]
4 Operating[7] fossil gas: natural gas[7] 180[7] combined cycle[8] not found 2005[7]
5 Operating[7] fossil gas: natural gas[7] 180[7] combined cycle[8] not found 2005[7]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
2-1 Zhuhai Shenneng Hongwan Electric Power Co Ltd [100%][2][7][1] Newton Industrial Ltd [38.5%]; Shenzhen Yuanzhi Investment Co Ltd [36.8%]; Shenzhen Energy Group Co Ltd [12.5%]; Huaneng Power International Inc [12.2%]
2-2 Zhuhai Shenneng Hongwan Electric Power Co Ltd [100%][2][7][1] Newton Industrial Ltd [38.5%]; Shenzhen Yuanzhi Investment Co Ltd [36.8%]; Shenzhen Energy Group Co Ltd [12.5%]; Huaneng Power International Inc [12.2%]
4 Zhuhai Shenneng Hongwan Electric Power Co Ltd [100%][2][7][1] Newton Industrial Ltd [38.5%]; Shenzhen Yuanzhi Investment Co Ltd [36.8%]; Shenzhen Energy Group Co Ltd [12.5%]; Huaneng Power International Inc [12.2%]
5 Zhuhai Shenneng Hongwan Electric Power Co Ltd [100%][2][7][1] Newton Industrial Ltd [38.5%]; Shenzhen Yuanzhi Investment Co Ltd [36.8%]; Shenzhen Energy Group Co Ltd [12.5%]; Huaneng Power International Inc [12.2%]

Background

Unit 4 and Unit 5 started operation in November 2005.[9]

The Phase II (Unit 2-1 and Unit 2-2) of Shenzhen Energy Hongwan Gas power station (深能洪湾燃机电厂) received approval from the Zhuhai Municipal Development and Reform Bureau in February 2022[10], and construction officially commenced on December 30, 2022.[11] According to the 2023 provincial key project plan issued by the Guangdong Provincial Development and Reform Commission, this project is scheduled to be completed and put into operation in 2023.[12]

Articles and Resources

References

  1. 1.0 1.1 1.2 1.3 1.4 "建设项目环境影响报告表" (PDF). 2022-06. Archived from the original (PDF) on 2024-05-10. Retrieved 2024-05-08. {{cite web}}: Check date values in: |date= (help)
  2. 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 https://web.archive.org/web/20220415212731/https://power.in-en.com/html/power-2404292.shtml. Archived from the original on 2022-04-15. {{cite web}}: Missing or empty |title= (help)
  3. , https://www.seetao.com/details/187638.html https://www.sohu.com/a/556599879_121117462 , https://www.seetao.com/details/187638.html. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  4. 4.0 4.1 "广东珠海:到2030年力争风电和光伏装机达到500万千瓦-北极星太阳能光伏网". mguangfu.bjx.com.cn. 2023-06-05. Archived from the original on 2024-05-10. Retrieved 2024-05-08.
  5. 5.0 5.1 5.2 5.3 "广东省2023年重点建设项目计划表" (PDF). Archived from the original (PDF) on 2024-05-10. Retrieved 2024-05-08.
  6. 6.0 6.1 https://www.seetao.com/details/187638.html. {{cite web}}: Missing or empty |title= (help)
  7. 7.00 7.01 7.02 7.03 7.04 7.05 7.06 7.07 7.08 7.09 7.10 7.11 https://web.archive.org/web/20220406222229/https://news.bjx.com.cn/html/20180906/926153-5.shtml. Archived from the original on 2022-04-06. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 https://web.archive.org/web/20220406222229/https://news.bjx.com.cn/html/20180906/926153-5.shtml. Archived from the original on 2022-04-06. {{cite web}}: Missing or empty |title= (help)
  9. "广东省57家燃机发电项目 136台机组汇总". 2018-09-06. Retrieved 2023-11-03.{{cite web}}: CS1 maint: url-status (link)
  10. "深圳能源:拟投建珠海洪湾二期天然气热电联产机组". 2023-06-01. Retrieved 2023-11-03.{{cite web}}: CS1 maint: url-status (link)
  11. "2×40万千瓦!深能洪湾电厂二期天然气热电联产项目桩基工程开工". 2022-10-21. Retrieved 2023-11-03.{{cite web}}: CS1 maint: url-status (link)
  12. "定了!珠海这6个省级重点项目今年建成投产!". 2023-04-11. Retrieved 2023-11-03.{{cite web}}: CS1 maint: url-status (link)