Shiliquan power station

From Global Energy Monitor
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Shiliquan power station (华电国际十里泉发电厂) is an operating power station of at least 1920-megawatts (MW) in 143 Jiefang Road, Shizhong, Zaozhuang, Shandong, China with multiple units, some of which are not currently operating. It is also known as 华电十里泉发电公司上大压小项目 (Unit 8, Unit 9).

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Shiliquan power station 143 Jiefang Road, Shizhong, Zaozhuang, Shandong, China 34.814444, 117.573056 (exact)
Loading map...

Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4, Phase III Unit 5, Phase IV Unit 6, Phase IV Unit 7, Unit 10, Unit 8, Unit 9: 34.814444, 117.573056

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Retired year Emergency/Backup
Phase I Unit 1 Retired coal: bituminous[1] 125 subcritical – 1979 2008 False
Phase I Unit 2 Retired coal: bituminous[1] 125 subcritical – 1979 2008 False
Phase II Unit 3 Retired coal: bituminous[1] 125 subcritical – 1980 2008 False
Phase II Unit 4 Retired coal: bituminous[1] 125 subcritical – 1981 2008 False
Phase III Unit 5 Retired coal: bituminous[1] 140 subcritical yes 1983 2024 False
Phase IV Unit 6 Operating coal: bituminous[1] 300 subcritical yes 1996 – False
Phase IV Unit 7 Operating coal: bituminous[1] 300 subcritical yes 1997 – False
Unit 10 Pre-permit[2][3] coal: bituminous[1][2] 660[2] unknown yes[2] – – False
Unit 8 Operating coal: bituminous[1] 660 ultra-supercritical yes 2016 – False
Unit 9 Operating coal: bituminous[1] 660 ultra-supercritical yes 2017 – False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Phase I Unit 1 Huadian International Power Co Ltd Shiliquan Power Plant [100%] Huadian Power International Co Ltd [100.0%]
Phase I Unit 2 Huadian International Power Co Ltd Shiliquan Power Plant [100%] Huadian Power International Co Ltd [100.0%]
Phase II Unit 3 Huadian International Power Co Ltd Shiliquan Power Plant [100%] Huadian Power International Co Ltd [100.0%]
Phase II Unit 4 Huadian International Power Co Ltd Shiliquan Power Plant [100%] Huadian Power International Co Ltd [100.0%]
Phase III Unit 5 Huadian International Power Co Ltd Shiliquan Power Plant [100%] Huadian Power International Co Ltd [100.0%]
Phase IV Unit 6 Huadian International Power Co Ltd Shiliquan Power Plant [100%] Huadian Power International Co Ltd [100.0%]
Phase IV Unit 7 Huadian International Power Co Ltd Shiliquan Power Plant [100%] Huadian Power International Co Ltd [100.0%]
Unit 10 Huadian International Power Co Ltd Shiliquan Power Plant [100%] Huadian Power International Co Ltd [100.0%]
Unit 8 Huadian International Power Co Ltd Shiliquan Power Plant [100%] Huadian Power International Co Ltd [100.0%]
Unit 9 Huadian International Power Co Ltd Shiliquan Power Plant [100%] Huadian Power International Co Ltd [100.0%]

Project-level coal details

  • Coal source(s): domestic

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

The coal-fired units of Shiliquan power station originally consisted of two 300 MW units brought online between 1996 and 1997, and five 125 MW unit. One 125 MW unit was upgraded to 140 MW around 2006, and four 125 MW units were retired in 2008 and subsequently demolished. The plant is owned by China Huadian.[4][5][6]

This photo from Google Earth shows Units 1-4 on the left and Units 5-6 on the right, prior to demolition of Units 1-4. The photo is dated 28 December 2009.

Description of Shiliquan-3 Expansion

Huadian proposed Shiliquan-3 power station at the same location. A 660 MW unit, unit 1, was approved for construction in 2013, and was scheduled to be completed in 2015.[7] Unit 1 was commissioned in November 2016.[8]

An additional 660 MW unit at Shiliquan-3, unit 2, was proposed (also known as Unit 9).[9] Construction activities at Shiliquan-3 Unit 2 were reported in March 2017.[10] The unit was commissioned in July 2017.[11]

Unit 8 and 9 are classified as "上大压小机组",or "扩建机组", meaning "suppress small to build big units," instead of a new Phase.

Phase III Unit 5 was retired in 2024.[12] Unit 10 is in development. In 2025, a feasibility study for Unit 10 was completed, and the EIA was initiated in early 2026.[13][14]

Articles and Resources

References

  1. ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 2.2 2.3 https://news.bjx.com.cn/html/20251216/1474906.shtml. {{cite web}}: Missing or empty |title= (help)
  3. ↑ https://news.bjx.com.cn/html/20260302/1485670.shtml. {{cite web}}: Missing or empty |title= (help)
  4. ↑ "List of major power stations in Shandong," wikipedia, accessed November 2014
  5. ↑ "华电国际十里泉电厂增容 总装机容量达1300MW," SASAC, 2006-04-25
  6. ↑ "十里泉发电厂," Baidu, accessed January 2023
  7. ↑ "华电十里泉电厂首台扩建机组获得核准," 国资委网站, 2013-03-26
  8. ↑ "华电国际十里泉发电厂“上大压小” 660MW超超临界扩建工程#8机组顺利完成168小时满负荷试运行," hlfdw.com, Nov 23, 2016
  9. ↑ "华电十里泉电厂“上大压小”第二台扩建机组开展前期工作," 中国华电集团公司 , 2014-12-16
  10. ↑ Juan Lee Chong, "华电十里泉电厂扩建9号机组汽轮机扣缸一次成功," Polaris News Network, 21 March 2017
  11. ↑ "华电国际十里泉发电厂扩建工程9号机组移交商业运行," 中国电建集团核电工程公司, 2017/7/18
  12. ↑ "山东省能源局印发关于淄博、枣庄市2024年已关停淘汰低效燃煤机组名单的公示". 微信公众号. 2024-11-13. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  13. ↑ "华电十里泉"上大压小"1×660MW煤电项目可研报告编制预成交公示". 微信公众号. 2025-12-16. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  14. ↑ "山东华电十里泉"上大压小"1×66万千瓦煤电项目环境影响评价第一次信息公示". 微信公众号. 2026-03-02. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.