Shuicheng Dongdi power station (贵州能源水城2×66万千瓦燃煤发电项目) is a power station under construction in Shuicheng, Liupanshui, Guizhou, China. It is also known as 水城经济开发区董地发电项目.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Shuicheng Dongdi power station Shuicheng, Liupanshui, Guizhou, China 26.537114, 105.032188 (approximate)
Loading map...


Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year
Phase I Unit 1 Construction coal: unknown 660 ultra-supercritical 2025 (planned)
Phase II Unit 2 Construction coal: unknown 660 ultra-supercritical 2026 (planned)

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Phase I Unit 1 Guizhou Shuicheng Energy Investment Power Generation Co Ltd [100%] Liupanshui Shuicheng District Nengtou Industry (Group) Co Ltd [100.0%]
Phase II Unit 2 Guizhou Shuicheng Energy Investment Power Generation Co Ltd [100%] Liupanshui Shuicheng District Nengtou Industry (Group) Co Ltd [100.0%]

Project-level coal details

  • Permit(s): 黔能源电力〔2023〕95号, 本次获批的是一期工程(首台机组核准批复),总投资34.1093亿元。[1]

Background

In September 2021, a "cooperation protocol" was reportedly signed for a 1,000 MW project.[2] The project was also listed as a 1 x 1,000 MW capacity project in the provincial major construction plan for 2022.[3][4]

In May 2022 and August 2022, a review meeting for a 2 x 660 MW project of the same name (Shuicheng Dongdi power generation project) was held.[5][6]

In January 2023, the first unit of the project was permitted.[7] In the 2023 Guizhou Province Coal Power Projects Three-Year Action Plan (2023-2025), only the first unit of the project was listed, with an estimated COD of 2025.[8]

In July 2023, a Feasibility Study review took place for both units of the proposed power station.[9][10] Thus, Unit 2 of the project was considered to be in pre-permit development.

In December 2023, the Environmental Impact Assessment for both units was approved.[11]

Articles and Resources

References

  1. "贵州2×660MW燃煤发电机组核准批复-北极星火力发电网". news.bjx.com.cn. 2023-02-07. Archived from the original on 2024-01-25. Retrieved 2023-10-23.
  2. 何枢率队到四川省成都市考察招商, shuicheng.gov, 2021-09-28
  3. 贵州六盘水市:推动水电和风光等新能源参与市场化交易 探索可再生能源消纳指标、电力绿证交易, BJX, 2021-12-14
  4. 2022年贵州省重大工程和重点项目名单, guizhou.gov, 2022-02-15
  5. "董地2×660MW超超临界发电项⽬社会稳定⻛险评估公众参与公示," Shuicheng, 2022-08-24
  6. "董地2X660MW超超临界发电项⽬可⾏性研究报告审查会议顺利召开," Shuicheng, 2022-05-25
  7. [https://news.bjx.com.cn/html/20230207/1286878.shtml "贵州2×660MW燃煤发电机组核准批复,"] BJX, 2023-02-07
  8. "省能源局关于公开征求《贵州省煤电项目建设三年攻坚行动方案(2023-2025年)》意见的函," Guizhou Energy Administration, June 2, 2023
  9. "贵州能源水城2×66万千瓦燃煤发电项目可研报告评审会召开," BJX, 2023-07-17
  10. "【项目】火电|2×1000MW!中电建河南公司喜中华润海丰二期4号机安装工程/2×660MW!贵州能源水城项目可研评审会顺利召开," MP Weixin, 2023-07-19
  11. "贵州能源水城2×66万千瓦燃煤发电项目环评审批公示," news.bjx.com, December 27, 2023