Shuicheng Dongdi power station

From Global Energy Monitor
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Shuicheng Dongdi power station (贵州能源水城2×66万千瓦燃煤发电项目) is a power station under construction in Shuicheng, Liupanshui, Guizhou, China. It is also known as 水城经济开发区董地发电项目.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Shuicheng Dongdi power station Shuicheng, Liupanshui, Guizhou, China 26.543657, 105.022817 (exact)[1]
Loading map...

Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase II Unit 2: 26.543657, 105.022817

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Emergency/Backup
Phase I Unit 1 Construction coal: unknown 660 ultra-supercritical 2025 (planned) False
Phase II Unit 2 Construction[1] coal: unknown[2] 660[2] ultra-supercritical[2] 2026 (planned) False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Phase I Unit 1 Guizhou Shuicheng Energy Investment Power Generation Co Ltd [100%][2] Liupanshui Shuicheng District Nengtou Industry (Group) Co Ltd [100.0%]
Phase II Unit 2 Guizhou Shuicheng Energy Investment Power Generation Co Ltd [100%][2] Liupanshui Shuicheng District Nengtou Industry (Group) Co Ltd [100.0%]

Project-level coal details

  • Permit(s): 黔能源电力〔2023〕95号[2], 本次获批的是一期工程(首台机组核准批复),总投资34.1093亿元。[2]

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

In September 2021, a "cooperation protocol" was reportedly signed for a 1,000 MW project.[3] The project was also listed as a 1 x 1,000 MW capacity project in the provincial major construction plan for 2022.[4][5]

In May 2022 and August 2022, a review meeting for a 2 x 660 MW project of the same name (Shuicheng Dongdi power generation project) was held.[6][7]

In January 2023, the first unit of the project was permitted.[8] In the 2023 Guizhou Province Coal Power Projects Three-Year Action Plan (2023-2025), only the first unit of the project was listed, with an estimated COD of 2025.[9]

In July 2023, a Feasibility Study review took place for both units of the proposed power station.[10][11] Thus, Unit 2 of the project was considered to be in pre-permit development.

In December 2023, the Environmental Impact Assessment for both units was approved.[12]

Both Phase I units are under construction. In 2023, the project was permitted.[13]

In 2024, EPC and main equipment contracts were awarded.[14][15] A groundbreaking ceremony was held in December, with construction starting in earnest in 2025.[16] In 2026, the project reached key milestones like boiler steel framing and generator stator lifts.[17][18]

Articles and Resources

References

  1. 1.0 1.1 http://www.gzlps.gov.cn/ywdt/jrld/202412/t20241214_86358792.html. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 "贵州2×660MW燃煤发电机组核准批复-北极星火力发电网". news.bjx.com.cn. 2023-02-07. Archived from the original on 2024-01-25. Retrieved 2023-10-23.
  3. 何枢率队到四川省成都市考察招商, shuicheng.gov, 2021-09-28
  4. 贵州六盘水市:推动水电和风光等新能源参与市场化交易 探索可再生能源消纳指标、电力绿证交易, BJX, 2021-12-14
  5. 2022年贵州省重大工程和重点项目名单, guizhou.gov, 2022-02-15
  6. "董地2×660MW超超临界发电项⽬社会稳定⻛险评估公众参与公示," Shuicheng, 2022-08-24
  7. "董地2X660MW超超临界发电项⽬可⾏性研究报告审查会议顺利召开," Shuicheng, 2022-05-25
  8. [https://news.bjx.com.cn/html/20230207/1286878.shtml "贵州2×660MW燃煤发电机组核准批复,"] BJX, 2023-02-07
  9. "省能源局关于公开征求《贵州省煤电项目建设三年攻坚行动方案(2023-2025年)》意见的函," Guizhou Energy Administration, June 2, 2023
  10. "贵州能源水城2×66万千瓦燃煤发电项目可研报告评审会召开," BJX, 2023-07-17
  11. "【项目】火电|2×1000MW!中电建河南公司喜中华润海丰二期4号机安装工程/2×660MW!贵州能源水城项目可研评审会顺利召开," MP Weixin, 2023-07-19
  12. "贵州能源水城2×66万千瓦燃煤发电项目环评审批公示," news.bjx.com, December 27, 2023
  13. "水城经济开发区董地发电项目一期工程(首台机组核准批复)". 北极星电力网. 2023-02-07. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  14. "贵州能源水城2×66万千瓦燃煤发电项目三大主机设备采购招标". 北极星电力网. 2024-04-17. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  15. "贵州能源水城2×660MW燃煤发电项目EPC总承包工程中标公示". 北极星电力网. 2024-05-15. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  16. "贵州能源水城2×66万千瓦燃煤发电项目开工仪式举行". 北极星电力网. 2024-12-13. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  17. "贵州能源水城2×66万千瓦燃煤发电项目1号锅炉钢结构首吊成功". 微信公众号. 2025-03-27. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  18. "贵州能源水城2×66万千瓦燃煤发电项目2号机组发电机定子顺利完成吊装". 微信公众号. 2026-04-03. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.