Shulbi Stage 2 hydroelectric plant

From Global Energy Monitor
Part of the
Global Hydropower Tracker,
a Global Energy Monitor project.
Report an error

Other names: Shulbinsk II

Shulbi Stage 2 hydroelectric plant is a hydroelectric power plant in pre-construction in Abay Region, Kazakhstan.

Project Details

Table 1: Project details for Shulbi Stage 2 hydroelectric plant

Status Nameplate capacity
Pre-construction[1][2] 348 MW[1]

Location

Table 2: Location details for Shulbi Stage 2 hydroelectric plant

Location River Coordinates (WGS 84)
Abay Region, Kazakhstan[3] Irtysh River[1] 50.3979, 81.0707 (approximate)[3]

The map below shows the approximate location of the hydroelectric power plant:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 https://www.samruk-energy.kz/en/shareholders-and-investors/all-projects/2447-project-description-construction-of-the-second-phase-of-shulbinsk-hpp. {{cite web}}: Missing or empty |title= (help)
  2. "План мероприятий по развитию электроэнергетической отрасли Казахстана до 2035 года". gov.kz. 2024-02-20. Archived from the original on 2024-04-17. Retrieved April 4, 2024.
  3. 3.0 3.1 https://timesca.com/report-addresses-cross-border-challenges-in-irtysh-river-basin/. {{cite web}}: Missing or empty |title= (help)