Shymkent CHP-3 power station (Шымкентская ТЭЦ-3, ТЭЦ АО "3-Энергоорталык") is an operating power station of at least 160-megawatts (MW) in Shymkent, Sayram, Turkistan, Kazakhstan with multiple units, some of which are not currently operating. It is also known as Tchimkent; Shymkent HPP.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Shymkent CHP-3 power station Shymkent, Sayram, Turkistan, Kazakhstan 42.27335, 69.693644 (exact)[1][2]

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Unit CC1, Unit ST1, Unit ST2: 42.27335, 69.693644

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Retired year
Unit CC1 pre-permit[2][3][4][5][6][7] fossil gas - natural gas[8][9] 556[10][8][2][11][7] combined cycle[8] 2028[7]
Unit ST1 operating[12][2] fossil liquids - fuel oil, fossil gas - natural gas[13][14][2][11] 80[15][13][11] steam turbine[15] 1980[2]
Unit ST2 operating[12][2] fossil liquids - fuel oil, fossil gas - natural gas[13][14][2][11] 80[15][13][11] steam turbine[15] 1985[2]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner
Unit CC1 3-Energoortalyk JSC [100.0%]
Unit ST1 3-Energoortalyk JSC [100.0%]
Unit ST2 3-Energoortalyk JSC [100.0%]

Background

There is a proposal to increase generating capacity through construction of a new 450 MW combined cycle unit.[16] This project was included in the "Comprehensive development plan for the city of Shymkent until 2023" which was adopted by the government in July 2019.[17] In October 2020, it was reported that to facilitate a detailed assessment of the project, a contract was signed for the development of a feasibility study.[18] There have been no updates as of April 2023. The proposal has not been mentioned in the "Comprehensive development plan for the city of Shymkent for the years 2021-2025".[19]

In October 2023, it was reported that construction of a combined cycle unit of 556 MW was being considered on the territory of the power station. A contract has been signed to develop a feasibility study, and project estimation work was in progress. Previously, a delegation from China had visited Shymkent to further discuss the project in detail.[20]

The project was included into the "Electric Power Industry Development Plan until 2035" released by the Ministry of Energy of Kazakhstan in February 2024. The construction of the new unit was put up for auction to secure financing. It is anticipated to be operational by 2028.[21] As of April 2024, there have not been any further updates about the project.

Articles and Resources

References

  1. https://www.google.com/maps/place/Tets-3+3-Energoortalyk/@42.272716669.6916681449m/data=!3m1!1e3!4m5!3m4!1s0x38a8e06d39e722ed:0x234cd1a84339398d!8m2!3d42.2727682!4d69.6937221. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 https://web.archive.org/web/20220126112931/https://tengrinews.kz/money/shyimkentskaya-tets-otmechaet-40-letniy-yubiley-423563/. Archived from the original on 26 January 2022. {{cite web}}: Missing or empty |title= (help)
  3. (PDF) https://web.archive.org/web/20230107000447/http://www.eurasianresources.lu/uploads/1/files/20077_ERG_SR%20ENG%20web2.pdf. Archived from the original (PDF) on 07 January 2023. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  4. https://web.archive.org/web/20220517154553/https://forbes.kz/process/urbanity/nepalskiy_milliarder_hochet_stroit_v_shyimkente_disneylend/. Archived from the original on 17 May 2022. {{cite web}}: Missing or empty |title= (help)
  5. https://web.archive.org/web/20210702225240/https://gastopowerjournal.com/item/9883-funding-secured-for-kazah-chp-project. Archived from the original on 02 July 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  6. https://web.archive.org/web/20220709172706/https://vera.kz/istoriya-o-tom-kak-v-shymkente-likvidiruyut-deficit-elektroenergii/. Archived from the original on 09 July 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  7. 7.0 7.1 7.2 https://web.archive.org/web/20240417003056/https://www.gov.kz/memleket/entities/energo/documents/details/611688?lang=ru. Archived from the original on 17 April 2024. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 8.2 (PDF) https://web.archive.org/web/20210702223725/https://invest.warmia.mazury.pl/images/ERG_Capital_Projects_ERG_Investment_Projects_ENG.pdf. Archived from the original (PDF) on 02 July 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  9. https://web.archive.org/web/20210702223112/https://www.primeminister.kz/en/news/v-pravitelstve-rk-prinyat-kompleksnyy-plan-razvitiya-goroda-shymkent-do-2023-goda. Archived from the original on 02 July 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  10. https://web.archive.org/web/20220709173109/https://erg.kz/ru/news/1653. Archived from the original on 09 July 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  11. 11.0 11.1 11.2 11.3 11.4 https://yujanka.kz/otoplenie-budet-vovremya-shymkentskaya-tets-3-gotova-k-rabote/. {{cite web}}: Missing or empty |title= (help)
  12. 12.0 12.1 https://web.archive.org/web/20221231113408/https://eurasianresources.lu/en/pages/all-enterprises/3-energoortalyk-jsc. Archived from the original on 31 December 2022. {{cite web}}: Missing or empty |title= (help)
  13. 13.0 13.1 13.2 13.3 (PDF) https://web.archive.org/web/20210702231008/https://esmap.org/sites/default/files/esmap-files/Rpt_199b97_kazakvol2.pdf. Archived from the original (PDF) on 02 July 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  14. 14.0 14.1 (PDF) https://web.archive.org/web/20221220073522/https://www.eurasianresources.lu/uploads/1/files/ERG%20SR%202019%20WEB.pdf. Archived from the original (PDF) on 20 December 2022. {{cite web}}: Missing or empty |title= (help)
  15. 15.0 15.1 15.2 15.3 https://web.archive.org/web/20220520005442/https://bbgl.ru/station/505. Archived from the original on 20 May 2022. {{cite web}}: Missing or empty |title= (help)
  16. "Шымкентская ТЭЦ отмечает 40-летний юбилей". Главные новости Казахстана - Tengrinews.kz. December 22, 2020. Archived from the original on July 2, 2021. Retrieved January 29, 2022.
  17. Горбунова, Арина (July 9, 2019). "Непальский миллиардер хочет строить в Шымкенте «Диснейленд»". Archived from the original on May 17, 2022. Retrieved July 11, 2022.
  18. "Нурлан Ногаев побывал в энергопроизводящих организациях Шымкента и Кентау". Erg.kz. Oct 27, 2020. Retrieved May 26, 2022.
  19. "ПЛАН РАЗВИТИЯ ГОРОДА ШЫМКЕНТ НА 2021-2025 ГОДЫ" (PDF).{{cite web}}: CS1 maint: url-status (link)
  20. "ОТОПЛЕНИЕ БУДЕТ ВОВРЕМЯ: ШЫМКЕНТСКАЯ ТЭЦ-3 ГОТОВА К РАБОТЕ". yujanka.kz. October 11, 2023. Retrieved November 2, 2023.{{cite web}}: CS1 maint: url-status (link)
  21. "План мероприятий по развитию электроэнергетической отрасли до 2035 года". www.gov.kz. February 20, 2024. Retrieved April 4, 2024.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.