Siba power station
| Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
| Related categories: |
Siba power station (Central termoeléctrica SIBA Energy) is an operating power station of at least 266-megawatts (MW) in Boca Chica, Santo Domingo, Dominican Republic.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Siba power station | Boca Chica, Santo Domingo, Dominican Republic | 18.45692, -69.62015 (exact)[1] |
Unit-level coordinates (WGS 84):
- 1: 18.45692, -69.62015
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Equipment | Emergency/Backup |
|---|---|---|---|---|---|---|---|---|
| 1 | Operating[2][3][4][5][6][7] | fossil gas: natural gas, fossil liquids: diesel, other: hydrogen (unknown)[8][2][9][10] | 266.1[2][6][11] | combined cycle[2][9][12][8] | not found | 2026[2][6] | Solar Turbines: PGM Titan 130, Solar Turbines: Titan 250, Doosan Skoda: DST G-20[9][13][14] | no |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
| Unit name | Operator | Owner | Parent |
|---|---|---|---|
| 1 | SIBA Energy Corp[2][15][10] | Monte Río Power Corporation Ltd [33%]; Soluciones en Gas Natural SA [33%]; Empresa Generadora de Electricidad Haina SA [34%][2][15][10][2][15][10][2][15][10] | InterEnergy Holdings [34.0%]; Soluciones en Gas Natural SA [33.0%]; APD Ventures Ltd [16.5%]; Caterpillar Inc [16.5%] |
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
Both units of this plant received financing in 2024, with a large number of lenders participating in the deal. Per the advising group: “Clifford Chance advised CIFI Services, S.A. (CIFI) as mandated lead arranger, Fondo de Inversión Cerrado Libre para el Desarrollo de Infraestructuras Dominicanas I, CIFI LatAm, S.A., BHD International Bank (Panamá) S.A., Banco De Reservas de la República Dominicana – Banco de Servicios Múltiples, Banco Popular Dominicano, S.A.- Banco Múltiple, BPR Bank S.A., Popular Bank Ltd., Inc., Banco Múltiple BHD, S.A., Banco Múltiple Promérica de la República Dominicana, S.A., St. Georges Bank & Company Inc., Banistmo S.A., Banco Ficohsa (Panama), S.A., as lenders, and Banco Popular Dominicano, S.A.- Banco Múltiple, as administrative agent, on the multi-currency long-term financing to SIBA Energy Corporation." The financing consisted of three different tranches: 1) a tranche in Dominican Pesos of up to DOP$4.1 billion, 2) a tranche in US Dollars of up to US$188 million and 3 a tranche in US Dollars of up to US$40 million.[16]
CODEMON is the EPC contractor for the project.[17]
Articles and Resources
References
- ↑ https://goo.gl/maps/ZUDNsV8d4kwhrqMw8.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 "SIBA Energy". EGE Haina. Archived from the original on 2024-01-25.
- ↑ https://www.oc.org.do/Servicios/Reportes/postdespacho.
{{cite web}}: Missing or empty|title=(help) - ↑ "Resolución SIE-043-2023-PS: Permiso de Interconexión al SENI - Termoeléctrica SIBA" (PDF). SIE (Superintendencia de Electricidad). 2023-05-30. Archived from the original (PDF) on 2024-01-25.
- ↑ https://presidencia.gob.do/noticias/siba-energy-inicia-operacion-de-ciclo-combinado-y-eleva-generacion-electrica-nacional-260.
{{cite web}}: Missing or empty|title=(help) - ↑ 6.0 6.1 6.2 (PDF) https://sie.gob.do/wp-content/uploads/2026/01/SIE-005-2026-PS.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ https://pizarra.sie.gob.do/.
{{cite web}}: Missing or empty|title=(help) - ↑ 8.0 8.1 "Inauguración de SIBA Energy: Central termoeléctrica de gas natural en República Dominicana". YouTube. 2023-02-22. Archived from the original on 2024-01-25.
- ↑ 9.0 9.1 9.2 "Resolución SIE-006-2023-RCD" (PDF). SIE (Superintendencia de Electricidad). 2023-01-17. Archived from the original (PDF) on 2024-01-25.
- ↑ 10.0 10.1 10.2 10.3 10.4 "CIFI estructura financiamiento equivalente a US$73 millones para la construcción y operación de central termoeléctrica en República Dominicana". CIFI. 2022-12-19. Archived from the original on 2024-01-25.
- ↑ (PDF) https://sie.gob.do/wp-content/uploads/2025/12/SIE-163-2025-PS.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.egehaina.com/Noticias?id=5636.
{{cite web}}: Missing or empty|title=(help) - ↑ "Inician construcción de segunda fase de central termoeléctrica a gas natural". Diario Libre. 2023-11-07. Archived from the original on 2024-01-25.
- ↑ "Ministro Santos inspecciona avances finales en la construcción del ciclo combinado de SIBA Energy - Ministerio de Energía y Minas". Ministerio de Energía y Minas - Gobierno de la República Dominicana. 2025-02-20. Archived from the original on 2026-02-04. Retrieved 2025-04-30.
- ↑ 15.0 15.1 15.2 15.3 "CNE otorga concesión definitiva a Central Termoeléctrica SIBA". Presidencia de la República Dominicana. Archived from the original on 2024-01-25.
{{cite web}}: Text "Presidencia de la República Dominicana" ignored (help) - ↑ "Clifford Chance advises on financing for SIBA Energy Corporation in the Dominican Republic". 3 June 2024. Retrieved 24 June 2026.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Siba 230MW Power Plant Closing of Combined Cycle | CODEMON". codemon.com. Retrieved 2026-06-24.
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.
