Simo solar farm
From Global Energy Monitor
| This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Simo Aurinko
Simo solar farm is an operating solar photovoltaic (PV) farm in Simo, Finland.
Project Details
Table 1: Phase-level project details for Simo solar farm
| Status | Commissioning year | Nameplate capacity | Technology | Owner |
|---|---|---|---|---|
| Operating[1] | 2025[1] | 70 MWp/dc[2] | PV[3] | Exilion Tuuli Ky [100%][2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Simo solar farm
| Location | Coordinates (WGS 84) |
|---|---|
| Simo, Finland[4] | 65.7071, 25.1402 (exact)[4] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://solarigo.fi/en/news/70-mwp-solar-power-plant-in-simo-connected-to-the-grid-the-first-solar-park-in-finnish-lapland/.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 "Exilion Tuuli laajentaa aurinkosähkön tuotantoon". 2022-10-06. Archived from the original on 2024-02-12. Retrieved 2024-01-05.
- ↑ https://exilion.fi/en/construction-of-the-simo-solar-power-plant-to-begin-in-the-spring/.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 https://suomenuusiutuvat.fi/en/solar-power/solar-power-projects-in-finland/solar-power-map/ https://aurinkosahkovoimalat.fi/voimala/41/?maxPower=600&minPower=20&plantStatus=17%2C19, https://suomenuusiutuvat.fi/en/solar-power/solar-power-projects-in-finland/solar-power-map/.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help)
