Singhori Coal Mine

From Global Energy Monitor
(Redirected from Singhori OC Mine)
This article is part of the
Global Coal Mine Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:
Related-articles:

Singhori Coal Mine is an operating coal mine in Parseoni, Nagpur, Maharashtra, India.

Location

Table 1: Project-level location details

Mine Name Location Coordinates (WGS 84)
Singhori Coal Mine Parseoni, Nagpur, Maharashtra, India 21.276666, 79.1275 (exact)

The map below shows the exact location of the coal mine:

Loading map...

Project Details

Table 2: Project status

Status Status Detail Opening Year Closing Year
Operating[1] 2017[1] 2028 (planned)[2]

Table 3: Operation details

Note: The asterisk (*) signifies that the value is a GEM estimated figure.
Capacity (Mtpa) Production (Mtpa) Year of Production Mine Type Mining Method Mine Size (km2) Mine Depth (m) Workforce Size
1.2[3] 1.119991[3] 2022[3] Surface Open Pit 4.25[2] 50* 537*

Table 4: Coal resources and destination

Total Reserves (Mt) Year of Total Reserves Recorded Total Resources (Mt) Coalfield Coal Type Coal Grade Primary Consumer/ Destination
12[3] 2023[3] 35 Subbituminous Thermal

Table 5: Ownership and parent company

Owner Parent Company Headquarters
Western Coalfields Ltd[4] Coal India India

Note: The above section was automatically generated and is based on data from the GEM April 2024 Global Coal Mine Tracker dataset.

Background

The Singhori coal mine is an opencast mine operated by Western Coalfield Limited, a subsidiary of Coal India, in Maharashtra, India.

Upon The Singhori mine had a designed capacity of 0.80 million tonnes per annum. It is owned by Western Coalfields Limited (WCL), a subsidiary of Coal India Limited. The Environment Clearance (EC) is on a mine lease area of 428 ha was granted on 17th May 2007 by MoEF.[5]

Coal India Ltd subsidiary Western Coalfields Limited has taken a step to slash down its coal auction floor price by 10 per cent of its specific mines. The reduced auction price will apply for coal of Mine Specific Source for all auctions to be conducted by WCL only in April 2020. This will help both power and non-power consumers to get coal at reduced price. WCL had identified 11 out of its total 66 mines in November 2019 to be Mine Specific Source especially for use of power plants at an additional add-on price of Rs 450 over notified price. These 11 mines include 8 Greenfield- Dinesh, Makardhokra I. Gokul. Bhanegaon, Singhori, Penganga, Yekona, Pauni II and 3 Brownfield- Mungoli, Niljai, Gondegaon were opened in the last 5 years to provide coal to power consumers of Central, Western and Southern India at their doorstep at cheaper landed price. Earlier these power plants were getting coal from mines located in Eastern India which was costly due to extra railway freight. With opening of new projects by WCL, coal became cheaper for these plants to the tune of INR1,000 per tonne on an average. Under a policy WCL requested power entities to share this gain by adding Rs 450 per tonne over notified price for these 11 specific mines. No change in pricing was done for remaining 55 mines. [6]

  • Operator: Western Coalfield Limited
  • Owner: Coal India Limited
  • Location: village Singhori, Tehsil Parseoni, District Nagpur, Maharashtra, India
  • GPS Coordinates: 21.2866759, 79.1436393
  • Status: Operating
  • Capacity: 1.2 MTPA
  • Production: 1.12 million tonnes (2020)
  • Total Resource: 35.07 million tonnes [7]
  • Mineable Reserves: 12.30 MT[7]
  • Coal Type:
  • Mine Type: Opencast with shovel-dumper combination
  • Start Year: 2007
  • Source of Financing: Coal India Limited
  • Permits and Applications: Environment Clearance, India MoEF, 17th May 2007

Project Expansion

Western Coalfields Limited proposed expansion of the Singhori OC mine from 0.80 MTPA to 1.12 MTPA in existing area 426.00 ha covered under existing EC land of 428.00 ha by the way of application for EC in January 2019.[8]

In May 2022, a proposal to increase the mine's production capacity from 1.12 to 1.2 MTPA over the existing mining lease area. The approval was a part of a special dispensation in which India's Ministry Of Coal requested the Ministry of Environment, Forest and Climate Change (MoEF&CC) to consider skipping the public consultation stage of the approval process and granting immediate ECs to coal mining projects requesting expansions up to 50% of their operating capacity within their existing mine lease area. The move is a part of India's push to enhance coal production in order to meet the country’s energy requirement.[9]

Expansion Details

Articles and Resources

Additional data

To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 (PDF) http://www.westerncoal.in/images/SINGHORI%20OC%20EXPN.pdf. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 (PDF) https://web.archive.org/web/20240122182412/https://environmentclearance.nic.in/writereaddata/Compliance/1220202296328753Final_EC_Singhori_forperiodof010422to300922.pdf. Archived from the original (PDF) on 22 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 (PDF) http://www.westerncoal.in/images/singhori_oc_env-2023.pdf. {{cite web}}: Missing or empty |title= (help)
  4. (PDF) http://www.westerncoal.in/images/grade_2021_22.pdf. {{cite web}}: Missing or empty |title= (help)
  5. Environment Clearance, India MoEF, 17th May 2007
  6. "CIL WCL Slashes Coal Auction Price of Specific Mines," Steel Guru, 6th April 2020
  7. 7.0 7.1 Environmental Clearance, "Singhori Opencast coal mine", Government of India Ministry of Environment, Forest, and Climate Change"], Accessed June 2021
  8. EC application for expansion from 0.80 MTPA to 1.12 MTPA, India MoEF, January 2019
  9. "Ministry Of Coal Requested MoEF&CC To Consider Expansion Of Mine Without Public Consultation Upto 50% Of Their Production Capacity", Orissa Diary, August 1, 2022.