Skoczów-Komorowice-Oświęcim Gas Pipeline

From Global Energy Monitor
Part of the
Global Gas Infrastructure Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error

Skoczów-Komorowice-Oświęcim Gas Pipeline is a proposed gas pipeline in Poland.[1]

Location

The pipeline would run through the municipalities of Skoczów, Jasienica, Bielsko-Biała, Bestwina, Wilamowice, Kęty, and Oświęcim.[1][2]

Loading map...

Pipeline Details

  • Operator: Gaz-System[2]
  • Owner: Gaz-System[2]
  • Parent: Gaz-System[2]
  • Proposed Capacity:
  • Length: 58 km[3]
  • Diameter: 500 mm / 20 inches[2]
  • Cost: €32 million (US$36.48 million)[4]
  • Status: Proposed[3]
  • Start Year:

Background

A positive environmental impact assessment (EIA) was issued for the pipeline in February 2015.[1] As of 2018, the pipeline was in the design phase.[5]

In 2019, Gaz-System anticipated obtaining a building permit in 2021.[6]

On April 27, 2021, plans relating to the location of the pipeline were approved by the Polish government.[7]

As of October 2025, the project does not feature a new date for commissioning.[3] The project status shows that Stage 1 (the SSRP Oświęcim – Oświęcim Zaborze junction, approx. length 0.55 km) has been constructed, while the remaining Stages II, III, IVa, IVb, V are in the design process.[3] The project is included in Gaz System's Ten-Year Development Plan for 2026-2035, with the pipeline expected to be commissioned by 2035.[8] The gas pipeline is expected to obtain a construction permit in 2026.[9]

Articles and resources

References

  1. 1.0 1.1 1.2 Skoczów-Komorowice-Oświęcim Gas Pipeline, Gaz-System, accessed August 2020
  2. 2.0 2.1 2.2 2.3 2.4 "Gazociąg Skoczów – Komorowice – Oświęcim" (PDF). GAZ-SYSTEM. Retrieved August 26, 2021.{{cite web}}: CS1 maint: url-status (link)
  3. 3.0 3.1 3.2 3.3 "GAZOCIĄG SKOCZÓW-KOMOROWICE-OŚWIĘCIM". Gaz System. Retrieved October 7, 2025.{{cite web}}: CS1 maint: url-status (link)
  4. "BEMIP Gas Regional Investment Plan - Annex : Infrastructure Projects" (PDF). ENTSOG. 2012. Retrieved August 26, 2021.{{cite web}}: CS1 maint: url-status (link)
  5. "National Report of the President of the Energy Regulatory Office" (PDF). URE.gov.pl. Retrieved August 26, 2021.{{cite web}}: CS1 maint: url-status (link)
  6. SKOCZOW-KOMOROWICE-OSWIECIM-TWORZEN GAS PIPELINE, Antea Group, Feb. 4, 2019
  7. "Obwieszczenie ws. ustalenia lokalizacji inwestycji towarzyszącej inwestycji w zakresie terminalu regazyfikacyjnego skroplonego gazu ziemnego w Świnoujściu dla inwestycji pn.: „Budowa gazociągu DN 500 MOP 8,4 MPa Skoczów – Komorowice – Oświęcim" - Ministerstwo Rozwoju i Technologii - Portal Gov.pl". Ministerstwo Rozwoju i Technologii (in polski). Retrieved 2021-08-26.
  8. "KRAJOWY DZIESIĘCIOLETNI PLAN ROZWOJU SYSTEMU PRZESYŁOWEGO NA LATA 2026-2035" (PDF). Gaz System. March 2025. Retrieved October 7, 2025.{{cite web}}: CS1 maint: url-status (link)
  9. "Plan Inwestycyjny status projektów" (PDF). Gaz System. October 2025. Retrieved October 7, 2025.{{cite web}}: CS1 maint: url-status (link)