Skoczykłody wind farm
From Global Energy Monitor
| This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Skoczykłody wind farm is an operating wind farm in Rawa County, Łódź Voivodeship, Poland.
Project Details
Table 1: Phase-level project details for Skoczykłody wind farm
| Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
|---|---|---|---|---|---|
| Operating[1] | 2015[2] | 36 MW[1] | Onshore[3] | PGE Energia Odnawialna SA [100%][1] | PGE Energia Odnawialna[1] |
Location
Table 2: Phase-level location details for Skoczykłody wind farm
| Location | Coordinates (WGS 84) |
|---|---|
| Rawa County, Łódź Voivodeship, Poland[3] | 51.7840, 20.1803 (exact)[3] |
The map below shows the exact location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 https://web.archive.org/web/20240126035424/https://pgeeo.pl/nasze-obiekty/elektrownie-wiatrowe/skoczyklody. Archived from the original on 2024-01-26.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20240126165927/https://www.gramwzielone.pl/energia-wiatrowa/103531/farme-wiatrowa-skoczyklody-miala-kupic-enea-kupilo-ja-pge. Archived from the original on 2024-01-26.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 3.2 https://web.archive.org/web/20240131233723/https://www.thewindpower.net/windfarm_en_24884.php. Archived from the original on 2024-01-31.
{{cite web}}: Missing or empty|title=(help)
