Solar Star 2
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Antelope Valley (Phases 1, 2, 3, 4, 5, 6)
Solar Star 2 is an operating solar photovoltaic (PV) farm in Kern County, California, United States.
Project Details
Table 1: Phase-level project details for Solar Star 2
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2014[1] | 19.5 MWac[1] | PV[1] | BHE Solar LLC [100%][2] | BHE Solar[2] |
2 | Operating[1] | 2014[1] | 52 MWac[1] | PV[1] | BHE Solar LLC [100%][2] | BHE Solar[2] |
3 | Operating[1] | 2014[1] | 60 MWac[1] | PV[1] | BHE Solar LLC [100%][2] | BHE Solar[2] |
4 | Operating[1] | 2014[1] | 56 MWac[1] | PV[1] | BHE Solar LLC [100%][2] | BHE Solar[2] |
5 | Operating[1] | 2014[1] | 48 MWac[1] | PV[1] | BHE Solar LLC [100%][2] | BHE Solar[2] |
6 | Operating[1] | 2015[1] | 44 MWac[1] | PV[1] | BHE Solar LLC [100%][2] | BHE Solar[2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Solar Star 2
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Kern County, California, United States[1] | 34.8486, -118.3528 (exact)[1] |
2 | Kern County, California, United States[1] | 34.8486, -118.3528 (exact)[1] |
3 | Kern County, California, United States[1] | 34.8486, -118.3528 (exact)[1] |
4 | Kern County, California, United States[1] | 34.8486, -118.3528 (exact)[1] |
5 | Kern County, California, United States[1] | 34.8486, -118.3528 (exact)[1] |
6 | Kern County, California, United States[1] | 34.8486, -118.3528 (exact)[1] |
The map below shows the exact locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 1.23 1.24 1.25 1.26 1.27 1.28 1.29 1.30 1.31 1.32 1.33 1.34 1.35 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
- ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 https://web.archive.org/web/20240206181235/https://www.nsenergybusiness.com/projects/solar-star-projects-california/. Archived from the original on 2024-02-06.
{{cite web}}
: Missing or empty|title=
(help)