Sorik Marapi geothermal power plant is an operating geothermal power plant in Mandailing Natal, North Sumatra, Indonesia.

Project Details

Table 1: Unit-level project details for Sorik Marapi geothermal power plant

Unit name Status Commissioning year Nameplate capacity Technology Owner Operator
1 Operating[1] 2019[1] 45 MW[2] Binary cycle[3] KS Orka Renewables PTE LTD [100%][4] KS Orka Renewables PTE LTD[4]
2 Operating[1] 2021[1] 45 MW[1] Binary cycle[3] KS Orka Renewables PTE LTD [100%][4] KS Orka Renewables PTE LTD[4]
3 Operating[5] 2022[4] 50 MW[4] Unknown type KS Orka Renewables PTE LTD [100%][4] KS Orka Renewables PTE LTD[4]
4 Operating[6] 2024[6] 50 MW[4] Unknown type KS Orka Renewables PTE LTD [100%][4] KS Orka Renewables PTE LTD[4]
5 Announced[4] 50 MW[4] Unknown type KS Orka Renewables PTE LTD [100%][4] KS Orka Renewables PTE LTD[4]

Location

Table 2: Unit-level location details for Sorik Marapi geothermal power plant

Unit name Location Coordinates (WGS 84)
1 Mandailing Natal, North Sumatra, Indonesia 0.7475, 99.5751 (exact)
2 Mandailing Natal, North Sumatra, Indonesia 0.7475, 99.5751 (exact)
3 Mandailing Natal, North Sumatra, Indonesia 0.7475, 99.5751 (exact)
4 Mandailing Natal, North Sumatra, Indonesia 0.7475, 99.5751 (exact)
5 Mandailing Natal, North Sumatra, Indonesia 0.7475, 99.5751 (exact)

The map below shows the exact locations of the geothermal power plant units:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global geothermal power plants, a downloadable dataset, and summary data, please visit the Global Geothermal Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 https://web.archive.org/web/20220418163704/https://www.thinkgeoenergy.com/45-mw-sorik-marapi-unit-2-geothermal-plant-starts-operation/. Archived from the original on 18 April 2022. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20220512135530/https://www.thinkgeoenergy.com/first-45-mw-of-sorik-marapi-geothermal-project-started-commercial-operation/. Archived from the original on 12 May 2022. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://web.archive.org/web/20221108130549/http://thinkgeoenergy.com/map. Archived from the original on 08 November 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  4. 4.00 4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 4.10 4.11 4.12 4.13 4.14 https://web.archive.org/web/20221005145610/https://ebtke.esdm.go.id/post/2020/02/17/2477/pltp.sorik.marapi.proyek.panas.bumi.berdurasi.tercepat. Archived from the original on 05 October 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  5. (PDF) https://pangea.stanford.edu/ERE/db/GeoConf/papers/SGW/2023/Habibi.pdf. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 https://web.archive.org/web/20240319071616/https://www.thinkgeoenergy.com/sorik-marapi-unit-4-geothermal-power-plant-in-indonesia-announces-cod/. Archived from the original on 19 March 2024. {{cite web}}: Missing or empty |title= (help)