South Azadegan' CTEP- West Karoun PS Oil Pipeline

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

South Azadegan' CTEP- West Karoun PS Oil Pipeline is an under construction oil pipeline proposed to run from Azadegan Oil Field to West Karoun in Khuzestan Province, Iran.[1]

Location

The pipeline is proposed to run from Azadegan Oil Field to West Karoun in Khuzestan Province, Iran.[1]


Loading map...

Project details

  • Operator:
  • Owner: National Iranian Oil Company[1]
  • Parent company: National Iranian Oil Company[1]
  • Capacity: 320000bpd [1]
  • Length: 50km[1]
  • Diameter:
  • Status: Construction
  • Start year:
  • Cost:
  • Financing:
  • Associated infrastructure:

Background

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 "Integrated Azadegan Development". Shana. 2022-06-09. Retrieved 2024-01-18.