Search results

From Global Energy Monitor
Results 1 – 15 of 15
Advanced search

Search in namespaces:

  • Tema FSRU (redirect from Tema LNG Terminal) (category Proposed LNG terminals in Ghana)
    contract Ghana Web, 14 July, 2019 Tema LNG receives FRU for its 1.7 Mt/year LNG import project (Ghana), Enerdata, Jan. 11, 2021 Dan Marks, Ghana LNG regasification
    9 KB (1,012 words) - 21:33, 10 August 2023
  • the Driftwood LNG export terminal. Driftwood LNG Terminal is a five-train 27.6 mtpa export terminal that was scheduled to begin operations in 2023. On March
    9 KB (1,006 words) - 14:54, 1 May 2020
  • Nigeria-Morocco Gas Pipeline (category Proposed pipelines in Ghana)
    m/year Length: 5,660 km Status: Proposed Start year: 2046 Cost: US$25 billion The Nigeria-Morocco Gas Pipeline was proposed in a December 2016 agreement between
    15 KB (2,395 words) - 06:42, 17 September 2023
  • West African Gas Pipeline (category Existing pipelines in Ghana) (section Ghana–Côte d'Ivoire Expansion)
    Western Ghana in the port city of Takoradi with gas delivery laterals extending from the main line to Contonou in Benin, Lome in Togo and Tema in Ghana. . Loading
    8 KB (1,246 words) - 18:48, 7 November 2022
  • Cotonou FSRU (redirect from Cotonour LNG Terminal) (category LNG terminals in Benin)
    an LNG terminal under development in Benin. There have been no updates in over five years and the project is presumed to be cancelled. However, in 2019
    4 KB (552 words) - 22:39, 5 August 2022
  • Ghana–Côte d'Ivoire Gas Pipeline (category Proposed oil and gas pipelines in Ghana)
    inches Status: Proposed (previously considered shelved) Start year: Cost: US$100 million The Ghana–Côte d'Ivoire Gas Pipeline is a proposed bidirectional
    3 KB (408 words) - 07:53, 17 September 2023
  • Takoradi (TICO) Thermal power plant (category Oil & Gas power stations in Ghana)
    -expansion-project-inaugurated-in-ghana. Archived from the original on 02 June 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing
    7 KB (757 words) - 01:04, 12 May 2024
  • Domunli Thermal Power Project (category Gas plants in Ghana)
    Project was a proposed 450-megawatt (MW) gas-fired power plant in Western Region, Ghana. As of December 2019, the project has not progressed in more than four
    1 KB (232 words) - 17:47, 21 March 2022
  • Ketu North power station (category Gas plants in Ghana)
    station was a proposed 2,000-megawatt (MW) gas-fired power plant in Volta Region, Ghana. As of December 2019, the project has not progressed in more than four
    2 KB (310 words) - 18:02, 21 March 2022
  • Wuta Beyin power station (category Gas plants in Ghana)
    map below shows the exact location of the proposed power station in Beyin - Jomoro District, Western Region, Ghana. Loading map... {"type":"HYBRID","minzoom":false
    2 KB (291 words) - 18:41, 21 March 2022
  • km natural gas pipeline network in southwestern Ghana which interconnects Genser power generation plants to the Ghana National Gas Company’s Prestea Regulating
    4 KB (614 words) - 15:44, 8 August 2023
  • Domunli power station (category Gas plants in Ghana)
    below shows the approximate location of the proposed power station in Jomoro District, Western Region, Ghana. Loading map... {"type":"ROADMAP","minzoom":false
    1 KB (220 words) - 17:46, 21 March 2022
  • Prampram Thermal Power Project (category Gas plants in Ghana)
    420-megawatt (MW) power plant in Greater Accra Region, Ghana. The map below shows the approximate location of the proposed power station in Prampram, Greater Accra
    2 KB (266 words) - 18:21, 21 March 2022
  • Prampram power station (category Gas plants in Ghana)
    the approximate location of the proposed power station in Miotso - Ningo-Prampram District, Greater Accra Region, Ghana. Loading map... {"type":"ROADMAP"
    2 KB (277 words) - 18:21, 21 March 2022
  • Sunon Asogli power station (category Oil & Gas power stations in Ghana)
    550 million kW to Ghana’s grid. In January 2017, the second unit came online. In 2019, IPPs covered 36% of the total generation in Ghana. The IPPs include
    11 KB (915 words) - 01:00, 12 May 2024