Search results

From Global Energy Monitor
Results 1 – 10 of 10
Advanced search

Search in namespaces:

  • Mombasa LNG Terminal (category Proposed LNG terminals in Kenya)
    Mombasa LNG Terminal is a proposed LNG import terminal in Mombasa, Kenya. The map below shows the location of Mombasa, the approximate location of the
    6 KB (686 words) - 17:01, 2 July 2025
  • Lamu Port-South Sudan (LAPSSET) Pipeline (redirect from Kenya Crude Oil Pipeline) (category Proposed pipelines in Kenya) (section Original Kenya Crude Oil Pipeline)
    is a proposed oil pipeline in South Sudan and Kenya. The LAPSSET Corridor was proposed after the Lokichar–Lamu Oil Pipeline was originally proposed as the
    21 KB (3,388 words) - 18:42, 12 August 2025
  • East African Crude Oil Pipeline (EACOP) (category Proposed oil pipelines in Uganda) (section Arrest of environmental activists in Uganda)
    Mombasa or Lamu routes in Kenya. At the same summit, President Uhuru Kenyatta announced that Kenya would build the Kenya Crude Oil Pipeline on its own, thereby
    40 KB (5,302 words) - 21:02, 4 December 2024
  • Uganda–Kenya Crude Oil Pipeline (UKCOP) (category Proposed pipelines in Kenya)
    SA, CNOOC Proposed capacity: Length: 1500 kilometers Status: Cancelled Start Year: The Uganda–Kenya Crude Oil Pipeline (UKCOP) was a proposed pipeline to
    5 KB (710 words) - 21:05, 4 December 2024
  • Mombasa-Nairobi Petroleum Products Pipeline (category Existing pipelines in Kenya)
    Government of Kenya. The replacement pipeline will run along the same route as the original pipeline, from Mombasa in Mombasa County, Kenya, to Nairobi in Nairobi
    4 KB (550 words) - 11:02, 30 April 2021
  • Kenya-Ethiopia (LAPSSET) Pipeline (category Proposed oil and gas pipelines in Kenya)
    Kenya-Ethiopia Pipeline is a proposed petroleum products pipeline, running from Lamu, Kenya, to Addis Ababa, Ethiopia. It is a component of the larger
    3 KB (354 words) - 10:48, 30 April 2021
  • Eldoret-Kampala-Kigali Petroleum Products Pipeline (category Proposed oil and gas pipelines in Kenya)
    Operator: Unclear; proposed by governments of Kenya, Uganda, & Rwanda Parent Company: Proposed capacity: Length: 784 km Status: Proposed Start Year: Oil Pipe
    3 KB (365 words) - 20:39, 29 April 2021
  • Tanzania–Kenya Gas Pipeline (category Proposed pipelines in Kenya)
    Government of Kenya Capacity: Length: 600 kilometers Diameter: Status: Proposed Cost: US$1.1 billion In April 2021, it was reported that Kenya and Tanzania
    3 KB (430 words) - 19:31, 4 December 2024
  • Dongo Kundu power station (category Oil & Gas power stations in Kenya)
    Suez. In 2014, Business Daily reported that the then president of Kenya had secured 1 million tonnes of LNG yearly from a Qatari state firm. In 2016, plans
    7 KB (594 words) - 00:55, 5 August 2025
  • Ronier–Djermaya Oil Pipeline (category Existing oil pipelines in Chad)
    contract was made. In 2013, the government of Chad suspended all operations conducted by CNPC in the country due to environmental degradation in the Koudalwa
    8 KB (1,082 words) - 20:53, 4 December 2024