Srebrzyszcze solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Srebrzyszcze solar farm is a solar photovoltaic (PV) farm in pre-construction in Chełm County, Lublin Voivodeship, Poland.
Project Details
Table 1: Phase-level project details for Srebrzyszcze solar farm
Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|
Pre-construction[1] | 2026 (planned)[2] | 30 MW[2] | PV[3] | PGE Energia Odnawialna SA [100%][3] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Srebrzyszcze solar farm
Location | Coordinates (WGS 84) |
---|---|
Chełm County, Lublin Voivodeship, Poland[3] | 51.1522, 23.5387 (approximate)[3] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ https://pgeeo.pl/aktualnosci/nowy-artykul4 https://pgeeo.pl/aktualnosci/pge-energia-odnawialna-s.a.-wybuduje-nowe-farmy-fotowoltaiczne-o-lacznej-mocy-180-mw, https://pgeeo.pl/aktualnosci/nowy-artykul4.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 2.0 2.1 https://pgeeo.pl/aktualnosci/pge-energia-odnawialna-s.a.-wybuduje-nowe-farmy-fotowoltaiczne-o-lacznej-mocy-180-mw.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 https://web.archive.org/web/20230126124032/https://pgeeo.pl/aktualnosci/nowy-artykul4. Archived from the original on 26 January 2023.
{{cite web}}
: Missing or empty|title=
(help)