Sulbagsel-2 power station
| Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
| Related categories: |
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Sulbagsel-2 power station is a power station in North Konawe, Sulawesi, Indonesia with multiple units of varying statuses, none of which are currently operating.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Sulbagsel-2 power station | North Konawe, Sulawesi, Indonesia | -3.814451, 122.447753 (approximate) |
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Emergency/Backup |
|---|---|---|---|---|---|---|
| New 1 | Announced[1] | fossil gas: natural gas[1] | 300[1] | combined cycle[1] | 2027 (planned)[1] | no |
| Unit 1 | Cancelled | coal: unknown | 200 | unknown | 2023 | no |
| Unit 2 | Cancelled | coal: unknown | 200 | unknown | 2024 | no |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| New 1 | PT PLN (Persero) [100%][1] | PT PLN (Persero) [100.0%] |
| Unit 1 | PT PLN (Persero) [100%][1] | PT PLN (Persero) [100.0%] |
| Unit 2 | PT PLN (Persero) [100%][1] | PT PLN (Persero) [100.0%] |
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
The plant was first proposed in the PLN long-term plan for 2019-2028.[2]
In October 2021, the project was shelved under the government's long-range plan for 2021-2030.[3]
In October 2023, with no apparent news since the project was shelved, Sulbagsel-2 power station was presumed to be cancelled.
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 (PDF) https://web.archive.org/web/20260311161557/https://gatrik.esdm.go.id/assets/uploads/download_index/files/b967d-ruptl-pln-2025-2034-pub-.pdf. Archived from the original (PDF) on 2026-03-11.
{{cite web}}: Missing or empty|title=(help) - ↑ Rencana Usaha Penyediaan Tenaga Listrik (RUPTL) 2019-2028, PT PLN Persero, V-59
- ↑ Rencana Usaha Penyediaan Tenaga Listrik (RUPTL) 2021-2030, PT PLN Persero, V-4
Additional data
To access additional data, including interactive maps of the power stations, downloadable datasets, and summary data, please visit the Global Coal Plant Tracker and the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.
