Sumatera hydroelectric plant
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Sumatera hydroelectric plant (PLTA Sumatera pumped storage 1) is an announced hydroelectric power plant in Tuktuk Siadong Village, Simanindo District, Samosir Regency, North Sumatra Province, Indonesia.
Project Details
Table 1: Project details for Sumatera hydroelectric plant
Status | Commissioning year | Nameplate capacity | Turbines | Technology type | Owner |
---|---|---|---|---|---|
Announced[1] | 2029 (planned)[1] | 500 MW[1] | 2 x 250 MW[1] | Pumped storage[1] | PT PLN (Persero) [100%] (PT Perusahaan Listrik Negara)[2] |
Location
Table 2: Location details for Sumatera hydroelectric plant
Location | Coordinates (WGS 84) |
---|---|
Tuktuk Siadong Village, Simanindo District, Samosir Regency, North Sumatra Province, Indonesia[1] | -2.6767, 100.0985 (approximate)[1] |
The map below shows the approximate location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 "PT PLN (Persero), RUPTL - Rencana Usaha Penyediaan Tenaga Listrik PT. PLN (Persero) 2021-2030" (PDF). Archived (PDF) from the original on 2021-10-21. Retrieved November 15, 2021.
- ↑ https://web.archive.org/web/20220813083025/https://www.power-technology.com/marketdata/sumatera-pump-storage-indonesia/. Archived from the original on 2022-08-13.
{{cite web}}
: Missing or empty|title=
(help)