Syar Khola hydroelectric plant

From Global Energy Monitor
Part of the
Global Hydropower Tracker,
a Global Energy Monitor project.
Report an error

Other names: Chumchet Syar Khola hydroelectric plant

Syar Khola hydroelectric plant is a hydroelectric power plant in pre-construction in Chumchet Village, Gorkha District, Gandaki Zone, Gandaki Province, Nepal.

Project Details

Table 1: Project details for Syar Khola hydroelectric plant

Status Nameplate capacity Technology type Owner
Pre-construction[1] 56 MW[2] Run-of-river[2] Bigland Hydropower Ltd [100%][3]

Location

Table 2: Location details for Syar Khola hydroelectric plant

Location River Coordinates (WGS 84)
Chumchet Village, Gorkha District, Gandaki Zone, Gandaki Province, Nepal[3] Syar Khola River[2] 28.4762, 85.0035 (approximate)[3]

The map below shows the approximate location of the hydroelectric power plant:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.

References

  1. https://web.archive.org/web/20221020003431/http://www.doed.gov.np/license/41. Archived from the original on 2022-10-20. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 (PDF) https://web.archive.org/web/20221004075342/http://chilime.com.np/media/publications/Chumchet_Syar_Khola_Hydroelectric_Project.pdf. Archived from the original (PDF) on 2022-10-04. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 https://web.archive.org/web/20221206083000/https://hydro.naxa.com.np/core/datasets/. Archived from the original on 2022-12-06. {{cite web}}: Missing or empty |title= (help)