TS Solar
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Nevada Gold Mines (NGM)
TS Solar is an operating solar photovoltaic (PV) farm in Eureka County, Nevada, United States.
Project Details
Table 1: Phase-level project details for TS Solar
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2024[1] | 100 MWac[1] | PV[2] | Newmont Corp [38%]; Barrick Gold Corp [61%][3] | Barrick Gold[4] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for TS Solar
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Eureka County, Nevada, United States[5] | 40.7461, -116.5297 (exact)[5] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 "U.S. Energy Information Administration". Preliminary Monthly Electric Generator Inventory. October 2024. Archived from the original on 2024-12-18.
- ↑ https://web.archive.org/web/20240201194712/https://www.barrick.com/English/news/news-details/2022/ngm-commences-construction-of-solar-facility/default.aspx. Archived from the original on 2024-02-01.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.barrick.com/English/news/news-details/2020/Conversion-of-NGMs-TS-Power-Plant-aligns-with-Nevadas-carbon-reduction-ambitions/default.aspx https://www.barrick.com/English/news/news-details/2020/Conversion-of-NGMs-TS-Power-Plant-aligns-with-Nevadas-carbon-reduction-ambitions/default.aspx, https://www.barrick.com/English/news/news-details/2020/Conversion-of-NGMs-TS-Power-Plant-aligns-with-Nevadas-carbon-reduction-ambitions/default.aspx.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240206181440/https://www.barrick.com/English/news/news-details/2020/Conversion-of-NGMs-TS-Power-Plant-aligns-with-Nevadas-carbon-reduction-ambitions/default.aspx. Archived from the original on 2024-02-06.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.