Tamor Khola 5 hydroelectric plant

From Global Energy Monitor
Part of the
Global Hydropower Tracker,
a Global Energy Monitor project.
Report an error

Tamor Khola 5 hydroelectric plant is a hydroelectric power plant in pre-construction in Lelep Village, Phaktanglung Rural Municipality, Taplejung District, Province No. 1, Nepal.

Project Details

Table 1: Project details for Tamor Khola 5 hydroelectric plant

Status Nameplate capacity Technology type Owner
Pre-construction[1] 38 MW[1] Run-of-river[2] Riverside Hydro Energy Company [100%][1]

Location

Table 2: Location details for Tamor Khola 5 hydroelectric plant

Location Coordinates (WGS 84)
Lelep Village, Phaktanglung Rural Municipality, Taplejung District, Province No. 1, Nepal[3] 27.5212, 87.7964 (approximate)[3]

The map below shows the approximate location of the hydroelectric power plant:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 https://www.investopaper.com/news/tamor-khola-5-hydropower-project/. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20210803013047/http://sanimaengineering.com/contract-agreement-with-river-side-hydro-energy-pvt-ltd-for-consulting-services-for-due-diligence-study-and-detailed-engineering-design/. Archived from the original on 2021-08-03. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://web.archive.org/web/20221206083000/https://hydro.naxa.com.np/core/datasets/. Archived from the original on 2022-12-06. {{cite web}}: Missing or empty |title= (help)