Tangier 2 wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Tanger Melloussa
Tangier 2 wind farm (الرحبة الريحية طنجة٢، Parc Eolien De Tanger, Parc Eolien De Tanger II) is a wind farm in pre-construction in Tangier, Tanger-Tetouan-Al Hoceima, Morocco.
Project Details
Table 1: Phase-level project details for Tangier 2 wind farm
Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|
Pre-construction[1] | 2024 (planned)[1] | 70 MW[1] | Onshore[2] | The National Electricity Office (ONEE) (المكتب الوطني للكهرباء والماء الصالح للشرب)[1] | Navera Group; Enel Green Power; Siemens[2] |
Location
Table 2: Phase-level location details for Tangier 2 wind farm
Location | Coordinates (WGS 84) |
---|---|
Tangier, Tanger-Tetouan-Al Hoceima, Morocco[3][1] | 35.7888, -5.8145 (approximate)[1] |
The map below shows the approximate location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 https://www.mem.gov.ma/Pages/secteur.aspx?e=2&sprj=138.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 https://www.mem.gov.ma/ar/Pages/secteur.aspx?e=2&sprj=154.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://en.wikipedia.org/wiki/Tangier.
{{cite web}}
: Missing or empty|title=
(help)