Tangshan LNG Terminal

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Tangshan LNG Terminal (中石油唐山曹妃甸LNG接收站)is an LNG terminal in Hebei, China.[1]

Location

Loading map...

Project Details

  • Sponsor: Petrochina Jingtang LNG Company Limited 中石油京唐液化天然气有限公司[2]
  • Owner: CNPC 51%, Beijing Gas JingTang Company Limited (北燃京唐有限公司) 29%, Heibei Natural Gas 20%
  • Parent: CNPC
  • Location: Caofeidian Industrial Zone, Tangshan, Hebei, China
  • Coordinates: 38.9331, 118.5329 (exact)
  • Capacity: 3.5 mtpa, 0.5 bcfd
  • Status: Operating
  • Type: Import
  • Start Year: 2013

Note: mtpa = million tonnes per year; bcfd = billion cubic feet per day

Background

Tangshan LNG Terminal is an LNG terminal in Hebei, China.[3] Phase I construction of the Tangshan LNG Terminal was completed in 2013 with four 160,000 cubic meter storage tanks and a receiving capacity of 3.5 mtpa. Phase II is planned to increase receiving capacity to 6.5 mpta. LNG from the terminal is sent to the Hebei province, Beijing, and Tianjin.[4] One LNG delivery was delayed in December of 2015 due to technical and operational issues at the Caofeidian [Tangshan] terminal and pipeline gas network, then diverted to PetroChina’s Dalian terminal.[5] In May 2016 it was reported that Kunlun Energy, a Hong Kong unit of CNPC, was looking to buy the Tangshan LNG terminal from its parent company CNPC.[6]

Second Phase Expansion Project Details

  • Owner: CNPC 51%, Beijing Gas Blue Sky Holdings Limited 29%, Heibei Natural Gas 20%
  • Location: Caofeidian Industrial Zone, Tangshan, Hebei, China
  • Coordinates: 38.9331, 118.5329 (exact)
  • Capacity: 3.5 mtpa, 0.43 bcfd
  • Status: Operating
  • Type: Import
  • Start Year: 2017[7]

Note: mtpa = million tonnes per year; bcfd = billion cubic feet per day

Expansion Background

The third phase began construction in March 2018. The operating date set at 2020. The news says it will add 4*160,000 cubic meters of capacity for gas storage.[8][9]

It was planning to begin operation in October 2020. [10] By April 2021, there is no news of its operation.

Third Phase Expansion Project Details

  • Owner: CNPC (CNPC Jingtang LNG Company Limited, 中石油京唐液化天然气有限公司), Beijing Gas Group (Beijing Gas Blue Sky Holdings Limited, 北京燃氣藍天控股有限公司)
  • Location: Caofeidian Industrial Zone, Tangshan, Hebei, China
  • Coordinates: 38.9331, 118.5329 (exact)
  • Capacity: 3.5 mtpa, 0.43 bcfd[7]
  • Status: Construction
  • Type: Import
  • Start Year: 2020

Note: mtpa = million tonnes per year; bcfd = billion cubic feet per day


Articles and resources

References

  1. 唐山LNG接收站,一起了解一下…… 上海石油天然气交易中心, 06/07/2020
  2. leslie. "中石油京唐液化天然气有限公司 - 企查查". www.qcc.com. Retrieved 2021-04-19.
  3. Tangshan LNG Terminal, GEO, accessed April 2017
  4. PetroChina's Tangshan LNG import terminal starts commercial operations, S&P Global Platts, December 2013
  5. China's Beijing Gas Group mulls short-term LNG storage, Xieli Lee, ICIS, March 2016
  6. Kunlun Energy selling upstream assets, targets buying LNG terminal, LNG World News, May 2016
  7. 7.0 7.1 "兴业证券评级跟踪报告--完成收购京唐公司29%股权,获取曹妃甸码头优质资产" (PDF). 2018-07-12.
  8. The third phase of the Tangshan LNG project started in Beijing and Tianjin, adding a "green barrier" Sina, April 16, 2019
  9. 我国19座已建LNG接收站概况 来源:能源平说, 01/-0/2019
  10. "唐山将建成国内最大LNG接收站_综合新闻_唐山环渤海新闻网". tangshan.huanbohainews.com.cn. 2019-12-09. Retrieved 2021-03-31.